几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 09:51 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 cofferdam systems

cofferdam systems?
i am putting together a cost estimate for a bridge. the bridge is to be constructed in a remote northern location (northern saskatchewan, near the nwt border, in canada). the bridge is to cross a river with a bedrock bottom. i am wondering what alternatives i have for the bridge pier construction. seeing as how the bottom of the river is bedrock, driven sheet piles are out of the question, as is the use of an earth type cofferdam. the width of the river is insufficient to allow an earth cofferdam without completely ubstructing the flow of the river. as well, an impermeable type fill material is unavailable due to isolation of the construction site.
the river is approximately 2.5 m (8.2') deep.
what cofferdam systems exist that would be suitable for this type of application?
thank you for any help you may be able to provide.
civil77 - i grew up in a bridge building family. while in high school, i had to opportunity be witness (up close) a project that may have had conditions similar to yours (bedrock bottom - but i think there was a some overburden).
the contractor constucted a traditional braced rectangular cofferdam (about 25 feet deep), but did not pump it. then he constructed another braced, concentric, rectangular, closed sheet pile wall around the cofferdam. as i re
you can use fabriform concrete bags to seal up the bottom of the prefabricated cofferdam. we recently supplied them to seal the bottom of a cofferdam at rabbit lake dam ontario.,for ontario hydro.they are placed at the bottom of the steel or concrete cofferdam and will pump up to fill all the voids in the rock bottom and seal the base of the cofferdam allowing you to pump.you dont need any bottom prep or formwork and are good for currents of 5 m/sec . dave ritchie . intrusion prepakt.
i really like slideruleera's post but also note that you can drive sheet pile in rock to a certain extent by drilling/coring ahead of the driving. yes this is costly, but it has been shown to work.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
aerospace hydraulic systems references huangyhg 精密机械 0 2009-09-05 10:14 PM
any have any perfect part numbering systems huangyhg tec-ease(America) 0 2009-09-04 04:40 PM
【转帖】any have any perfect part numbering systems yang686526 American standards 0 2009-04-29 06:23 PM


所有的时间均为北京时间。 现在的时间是 03:20 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多