几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 01:41 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 contraction joints in suspended slabs

contraction joints in suspended slabs
what is everyone's thoughts on placing sawcut contraction joints in suspended slabs? i routinely place them in slabs on grade but am unsure about the wisdom of placing planes of weakness in a structural slab. most of my suspended slabs are designed with integral beams and removable forms and are tied to the walls. i have not been able to find any guidance on this situation. thanks.
check out our whitepaper library.
i can't think of a situation in which a saw cut in a suspended slab would be advantageous.
exposed parking decks, stadiums, unfinished office floors, roofs and other exposed concrete elements. if you are carpeting or tiling, don't bother. contraction joints take the place of naturally formed cracks (ie you're going to have a crack near there anyhow).
the advantage of a contraction joint is that you can put sealant in it during construction, you can designate a profile for the joint (rounded edges), and it looks better.
a saw cut joint only works as a contraction joint when you saw cut the concrete before it cracks. this means you have to cut the concrete within hours of casting it (good luck with that).
i don't put them in suspended slabs or composite steel beam/joist systems, i put them in topping slabs for precast.
definately not in suspended slabs.
if you need movement joints in slabs then provide a full movement joint in the form of an edge supported on a corbel or double frames with a full joint between them.
google it and you will find many references on this.
expansion joints at floors when wanted or required for proper account of rheological movements (temperature and shrinkage mainly) need be purposedly designed. the olden practice was to duplicate columns at each side of one of these joints, but today it becomes everyday more common to use shear contraptions sold by specialty providers that allow movement perpendicular to the face of the joint and horizontally as well if so wanted or required, whilst coercing vertical relative displacement and even support if one of the sides is rigid enough.
ishvaag,
provision of double columns at a movement joint is not an "olden practice". it is the right way to do it. halving joints and corbels are a major cause of modern building structural distress and serviceability issues.
who made this post so wide?
ditto; use cast contraction/movement joints where required for large buildings.
stay well away from sawcut joints for suspended slabs.
for parkades, i've often used a "goldblatt groover" to provide a joint to be filled with a flowable joint filler. i've not used a saw.
dik,
but the question was about suspended slabs. surely you don't need a joint filler in suspended slabs where the top of the slab is in compression.
joints are made at supports and rely on the reinforcing steel. yes, it's designed with this in mind.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
contraction joints in slab huangyhg 产品功能分析 0 2009-09-08 01:41 PM
construction joints in concrete huangyhg 产品功能分析 0 2009-09-08 01:28 PM
construction joints in conc pedestrian tunnel huangyhg 产品功能分析 0 2009-09-08 01:27 PM
concrete tanks - vertical construction joints in walls huangyhg 产品功能分析 0 2009-09-08 12:55 PM
bonded topping joints huangyhg 产品功能分析 0 2009-09-07 04:21 PM


所有的时间均为北京时间。 现在的时间是 02:54 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多