默认 cracks in ramped parking

cracks in ramped parking
hi
in a high rise 25 storey residential building with 2 level parking, cracks have developed at every ramp beam column joints and at one place across the ramp slab within one weeks of construction. why it is developed? is it design mistakes..
ramp width - 6m
ramp slope 13%
ground floor to first parking height is 4.85m
1 st park to 2 park height is 3.35m
ramp support on side beams and columns,parking slab - flat slab
regards
hi sag04,
could be shrinkage. the ramp slope is also high for maintaining sloped concrete during the pour.
regards
vod
much more info. is required to suggest some possible causes.
was there a full time inspector or on-site structural engineer?
was there photos taken of these areas with all rebar in place before the pour?
was shoring removed?
was it reshored?
was the seor consulted on the cause?
how wide are the cracks?
is there rebar running thru the cracks?
was some rebar left out?
who inspected the rebar before the pour?
how long (in feet) was the pour?
what is the distance between exp. joints?
what was the temperature variation during that period?
how was the slab cured and protected?
what part of the country is this in?
very likely shrinkage at restraint points considering the timing of appearance. good idea to go through jike's checklist though.
hi jike
was there a full time inspector or on-site structural engineer? - yes
was there photos taken of these areas with all rebar in place before the pour? no
was shoring removed? yes
was it reshored? no
was the seor consulted on the cause? no
how wide are the cracks? hair line cracks
is there rebar running thru the cracks? yes
was some rebar left out? no
who inspected the rebar before the pour? site inspector
how long (in feet) was the pour? first ramp length is 37.45m and second one 22.45m
what is the distance between exp. joints? the building expansion joint is running across the first ramp at 17 m from the starting point. second ramp starting exactly from expansion joint so no eaxpansion joint. most serious concern is contractor and site inspector forgot to make the expansion joint in first ramp. they poured the concrete continously with continous rebar thru the exp joint.what was the temperature variation during that period? day time 48c and night 32 c
how was the slab cured and protected? normal - water spray curing
what part of the country is this in? dubai
column spacing is 6m slab thickness 22 cm.
the site inspector is my friend and so please help me to give him some insight.
thank you all
sag04
from additional info, still sounds like shrinkage cracking. put some crack monitoring devices (avongard or similar) and monitor for a while. you'll likely see little movement.
it sounds like the cause might be shrinkage if it cracked within one week of construction. if it cracked before the shoring was removed then it is most likely shrinkage. if it cracked after the shoring was removed, then it could be either shrinkage or perhaps flexural in nature. was the shoring removed too early?
it makes me a little suspicious that it cracked at every beam column joint although there must be some flexural cracking before the rebar takes over. what is the unreinforced concrete cracking moment at the beam column intersection? does the dead load moment exceed this cracking moment?
the crack in the middle of the slab definitely sounds like shrinkage.
i highly recommend that you involve the seor. he is intimately familiar with the design of the structure and we can only guess (sometimes right and sometimes wrong) at a few of the possibilitites.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cracks in new cmu basement wall huangyhg 产品功能分析 0 2009-09-08 02:27 PM
cracks in foundation wall huangyhg 产品功能分析 0 2009-09-08 02:26 PM
cracks in flat plate slab huangyhg 产品功能分析 0 2009-09-08 02:26 PM
cracks in concrete wall huangyhg 产品功能分析 0 2009-09-08 02:26 PM
cracks caused by earthquake huangyhg 产品功能分析 0 2009-09-08 02:25 PM


所有的时间均为北京时间。 现在的时间是 08:04 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多