默认 existing building analysis concrete flat plate

existing building analysis concrete flat plate
hello:
i'm currently analyzing an eight story building that they want to expand one floor.
the existing structure was built in 1960 in wisconsin. it is a two way flat slab with drop panels and column capitols. we were checking to see if it was ok for seismic loads. (we have site class c and it turns out the loads are less than wind.)
however i can't seem to get the building to work for gravity loads and especially wind loads. the building has several expansion joints and the area i'm looking at has no stair or elevator towers. therefore i'm using frames with the columns and flat plates.
the problem is that the flat plates do not give a lot of rigidity. i'm getting very high k values which makes my pc exceed the existing column load. (without the weight of the addition!!!) i'm using the slab length from face of capitol to face of capitol for my ei/l calculation. i'm using the width of my drop panel for calculating the i of the slab. i'm using an average depth of the slab as well.
for the most part i'm coming up with memebers that are 20% overstressed. i know i can have the concrete checked and it probably has more capacity. however i do that it will increase my e for the columns and thus increase my k. (original plans show 3000psi for floor. 5000 psi for columsn. i assumed rebar is 40000psi for the time.)
here is my questions:
1. has anyone done something like this and can give advice?
2. is it possible that lateral load was never considered?
3. is it just silly to try to get a flat plate to work in this application?
thanks for any help you can give me.
craig
find a job or post a job opening
craig call the original design team if they are still around and ask them for there design cals.
the building was designed 45 years ago. they are long gone.
are your frames infilled?
are you checking it with the old wind loads?
vod
you mention that your building has a number of expansion joints. in this case, are you applying both windward and leeward wind to the "portion" of the building you are checking? for buildings with expansion joints, many times the portion of building being designed does not see both....just a thought that might reduce the wind on your model.
in 1960 it could well be that the wind loads used were smaller than what is now applied. however, you must use currently applicable wind loads from the governing building code. you cannot use old code wind.
you may just have to notify the owner that the current building frame does not meet code and add infill shearwalls or some other sort of bracing. perhaps the bracing is only required in the lower floors.
another thought - perhaps tying the building together across the expansion joints could be considered. most of the concrete shrinkage has already occurred and it could be that there are too many joints than truly necessary.
eight story building to have one story expansion doesn't seem to be a big problem. i once involved in an expansion of a flat-plate parkade, three story existing, to add three stories!
but eight story flat-plate without shear core (stair well, elevator core, etc), shear wall, or bracing in seismic zone appears a bit odd to me. in this case, the bending moment in lower columns is definitely a critical factor, the beams (flat-plate) will have significant bending as well. the 20% overstress may be a hint that the structure is not modeled or calculated the same way as the original designer did.
the three story parkade was successfully expanded with steel bracing all the way up in a bay (to reduce the column load from lateral load) and using steel and metal deck for the new portion (to reduce the gravity load).
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
beams braced with a welded flat steel plate huangyhg 产品功能分析 0 2009-09-07 03:12 PM
analysis of submerged flat plate huangyhg 产品功能分析 0 2009-09-07 11:39 AM


所有的时间均为北京时间。 现在的时间是 10:29 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多