默认 fee for critical lift plan

fee for critical lift plan
we are preparing a critical lift plan for an 88t pick in a conjested area. the erector's contract required a sealed plan. no problem doing the work but we are not sure what to charge. it seems like the liability is disproportionate to the hours of work. any guidance? thanks

ten hour minimum, with credit toward future jobs if not spent on this pick design.
do you have a special rider on your insurance for this particular project? is this work out of the ordinary for you? i would discuss this with your underwriter.
if you think that this work is higher risk than your other projects i would factor that "increased risk" times your deductible and add that in to your fee.
check and double check.
check factors of safety required by osha or asme standards applicable.
check into wind loading- try to get crane manufacturere to confirm allowable wind loads, not normally shown on crane load charts.
check how load weight was figured- how approximate as compared to the percent of crane capacity.
check into soil bearing issues if appropriate.
i'm not an insurance expert- but typically on a contractor's insurance, they are asked to list the project owner, consultant, etc. as "also insureds"- see if it does anything to get yourself listed there.
all,
thanks for the help. the project has taken a few turns so the hours are more proportional to the risks. the boss has taken care of the insurance issue.
jike, we are a small structural engineering firm. we often check lifting on products (precast concrete) that we design but this is the first "critical lift" that we have been asked to do.
a.) be absoulutely certain you have insurance and that you have enough, both o&e and generally liability. most standard design firms do not have o&e covreage for this type of work. general liability should be substantial; 10 million would be a minimum, with 30 to 50 million more reaistic.
b.) be sure to review, with design engineer present, with the contractor's project manager, superintendent and crane operator. have a third party review it.
c.) buy shaperio's book "cranes and derricks" 3rd ed.
d.) temporary construction is different from standard structural engineering.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
fee distribution for typical building projects huangyhg 产品功能分析 0 2009-09-09 11:26 AM
design reuse fee huangyhg 产品功能分析 0 2009-09-08 05:58 PM
car lift over framedsteel decking huangyhg 产品功能分析 0 2009-09-07 10:55 PM
cad and engineering fee spli huangyhg 产品功能分析 0 2009-09-07 06:05 PM
4 leg sling huangyhg 产品功能分析 0 2009-09-07 08:43 AM


所有的时间均为北京时间。 现在的时间是 04:05 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多