几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 11:27 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 fees for shop drawings

fees for shop drawings
hello.
what kind of fee is typical for reviewing shop drawings? thanks.
reviewing submittals is typically included in the overall structural fee for a project. we try to leave 25% of our fee for construction phase activities, such as site visits, construction bulletins, reviewing submittals, etc.
daveatkins
daveatkins,
thanks for your respond. what i meant by shop drawing is review shop drawings from steel fabricator. so, what fee should be applied?
structural01, i believe i can answer for him. reviewing all types of shop drawings is typically included in the construction administration portion (around 20-25% of the fee). so reviewing shop drawings from the steel fabricator is typically included in your fee.
i believe you didn't read his post closely enough.
normally when i get a set of drawings from a steel fabricator, i don't know the total construction cost. so, how can you set a 25% fee? the drawings are steel detail drawings.
25% of your design fee. did you not design the building/bridge for which you are receiving shops?
25% should cover "steel shop drawings" as well as concrete mix design, weld procedure, and other submittals required to be submitted per project specifications. in addition, it should cover other construction admin activities such as responding to rfi's, site visit, etc.
if you need a $ amount to charge for reviewing shop drawings, why don't you multiply your company's standard mark-up by your direct salary.
the shop drawings i receive i don't design the original building. sometime the building structural drawing layout calls out for the design of connections for certain load or other requirements by others.
i think i agree with whyun. the thing to do might be to charge based on hourly or salary fee.
thanks to all your responds.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
dimensions on structural drawings huangyhg 产品功能分析 0 2009-09-08 06:51 PM
certification of shop drawings huangyhg 产品功能分析 0 2009-09-07 11:16 PM
who creates assembly drawings huangyhg tec-ease(America) 0 2009-09-05 02:02 PM
itile block huangyhg tec-ease(America) 0 2009-09-05 01:23 PM
【转帖】itile block yang686526 American standards 0 2009-05-04 10:45 AM


所有的时间均为北京时间。 现在的时间是 05:46 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多