几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 07:07 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 im moment frame happy1

i'm moment frame happy!
i have a unique situation where i have a 1 story steel framed building with bar joists and metal deck roof. the building is appox. 70'x180'. the problem lies in the fact that the building elevation including the metal deck steps up 2'-0" at 3rd points along the 180' dimension. so that basically means i need a braced or moment frame at those locations. so for lateral resistance to wind loads perp. to the 180' dimension of the building i will need frames at the outer walls and a frame at each of the jogs in the roof diaphragm (total of 4 frames). do i have any other ways around this? seems like alot of frames for a building 180' wide. thanks
can't you develop vertical mini-braces to take the upper diaphragm forces down to the lower diaphragms? or perhaps the columns can simply cantilever up to transfer the forces from one level to another.

yes, i have thought of that. but what happens when i take and put the reaction into my adjacent roof diaphragms. then i'm basically treating my outer bays as 3 sided diaphragm or an open c shape(assuming i will have frames perp to the frames we are talking about). is this acceptable with a metal roof deck?
depending on how high the building is, you could try cantilever columns. if the building is fairly tall, this idea isn't the greatest idea.
just throwing out ideas, though this may be no better than moment frames.
well, through the vertical jog in the diaphragm you would still want to create a tension/compression chord at the level of the lower roofs, that would extend through/under the clerestory.

jae, i think i see what you are doing... essentially you are looking at the whole building as a simple span beam and transfering the shear load by diagonal braces or by cantilevering the tops of the columns at the roof jogs. also creating a continuous member chord
ah...that is different.
but if your lowest chord can be developed all the way through, and you transfer down to a perimeter chord of beams at the high end, maybe that could work.

i think we are getting somewhere!! do you think its logical to transfer my chord force (from higher to lower roof) thru a cantilevered column or say a couple as i did to transfer the shear load to the adjacent roof?
the cantilevered column can work...you just need to check strength and stiffness response.
this sort of feels like a case where i'd be tempted to model the whole thing in risa 3d or similar program to get the full results of the various load paths, stiffnesses, etc.

yeah, i agree. i probably should model it in risa. i was trying to simplify it as much is possible and try doing it by hand. obviously its not that simple. i agree there is alot of strenght and stiffness stuff going on with cantilevered columns and so forth. i want to make sure everything is accounted for since i have a fair amount of brick veneer on the building. thanks for all of your help!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
design of moment connections huangyhg 产品功能分析 0 2009-09-08 05:43 PM
cantilever steel beam at column huangyhg 产品功能分析 0 2009-09-07 10:40 PM
bracing for moment frame huangyhg 产品功能分析 0 2009-09-07 04:41 PM
beams shear splices vs. moment splices huangyhg 产品功能分析 0 2009-09-07 03:13 PM
aisc 13th ed. and cjp dw moment connections huangyhg 产品功能分析 0 2009-09-07 10:27 AM


所有的时间均为北京时间。 现在的时间是 12:39 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多