几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 10:07 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 aciwhat are the factor of load cases in analysis of piles

aci:what are the factor of load cases in analysis of piles
hi all,
i am working in project designed by aci.
with members of the body structural part( slab, beam, column) i used combination with factored load (these combination are shown detailly in aci).
to calculate the numbers of pile, i want to use allowable stress design (in which force at top of pile compared with allowable capacity of pile), and use combination with unfactored loads. but i can not find provision showing detailly about these combination in aci.
could you kindly please give me a detail table about these above combination, for example:
1. f1d+f2l;
2. f3d+f4l+f5w;
3. f6d+f7l+f8e;
...
with f1=; f2 = ...
i am looking forward to hearing from you


d + l
d + 0.75l + 0.75w
0.6d + w
d + 0.75l + 0.75(0.7e)
0.6d + 0.7e
with these load combinations, a 1/3 increase in allowable capacity is not permitted.
daveatkins
thanks daveatkins!
your counsel are highly appreciated.
one more question:
i found in ibc that "when having more than two or more transient load act simultaneously with the dead load,ibc 1605.3.1.1 permit a 25% transient load reduction-> have factor = 0.75 in these cases. and i found the same in aci standard;
but: about a 40% reduction of dead load in combination (0.6d+w, 0.6d+0.7e), i only found in ibc, did not in aci;
could you kindly show me:where in aci say about this reduction or where in aci permit use ibc code (because in my project i have to use aci code)
i look forward to hearing from you
ose,
chapter 8 (of aci318-08), section 8.2, defaults to asce 7. chapter 2 of asce7,"combinations of loads" calls out the basic combinations in 2.3.2. ibc section 1605.3 is similar to asce7.
i hope that this answers your question.
ose,
in the two cases you asked about the 0.6d does not represent a 40% reduction in dead load. rather it is a 40% reduction in the stabilising effect of the dead load against the wind or earthquake load. in other words, watch the signs.
aci would not have a 0.6 factor anywhere, because concrete is designed using ultimate strength design, not allowable stress design.
daveatkins
dear all,
thanks for your answers. they make me understand clearly about load combination.
i wish that we can discuss more in future.
with very best wishes,
ose
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
a question regarding usa 1975 snow load cases huangyhg 产品功能分析 0 2009-09-07 09:09 AM
ad load factor in asd huangyhg 产品功能分析 0 2009-09-06 10:22 PM
olerance analysis books huangyhg tec-ease(America) 0 2009-09-05 01:24 PM


所有的时间均为北京时间。 现在的时间是 06:55 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多