几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 11:56 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 concrete cover at reinforcing couplers

concrete cover at reinforcing couplers
how do you deal with concrete cover at couplers.
for instance, if you have 2" of clear cover to a bar and place a coupler on it, all of a sudden you only have 1-1/2" clear cover.
my specific circumstance is a connection to existing reinforcing where 10" of reinforcing was left sticking out of the existing construction for future use. it happens to be in a waste water treatment plant, so i'm more worried about corrosion than development length.
i also have to provide a similar detail for the next guy who comes around to add further future construction.
i think my options are. 1) coat the coupler and the reinforcing around it with something like sika armatec 110 epocem which is a corrosion inhibitor (anyone have any experience with armatec? any alternative products?), 2) coat the surface of the wall with a waterproofer (subject to maintenance, yuck), 3) provide 3" of clear cover for the next guy so he doesn't have an issue (seems inefficent).
i'm interested to hear your thoughts.

i would say coating would be the best option. moving the bars in just for cover at a single point seems unreasonable. if you don't have sufficient cover, however, there is the fire resistance concern but since you are in a wastewater plant area, perhaps not a big concern.
if my basins catch on fire, something has gone seriously wrong.
jae, have you ever used armatec 110 or a similar product?
talk to the manufacturer about this.
the couplers that i have used in the past were justified on the basis of:
1. the coupler is made of a material with lower corrossion potential than reinforcing steel.
2. the area of the coupler exposed to more heat under fire is negligible compared to the overall volume of the bars that it is attached to.
i am sure these were based on tests e.t.c. that the manufacturer had done (it was a while ago), so the manufacturer of your couplers may have similar information.
csd
hot-dipped galvanized rebar mech splices are available. stainless steel rebar and couplings are available too
be careful to use stainless steel and normal steel together. it can accelerate the corrosion in the normal steel.
csd
have not used armatech. sorry.
since aci 318 does not clearly spell out where cover is measured from, for the situation you have described, why not check icc-es legacy reports for guidance? in these reports, cover is measured from surface of coupler sleeve. i did not dig deep enough to ascertain whether a reduction in cover is allowed if sleeve is coated.
do a search for the word coupler...and review reports.
aci-318 building code allows tolerences on clear cover. this tolerence can even be a negative number.
we use sika armatec-110 quite frequently as bonding agent during concrete repair work. once or twice we have used this product as corrosion inhibitor as well, when the rebars in concrete
degussa (masterbuilders, or whatever they are called now) makes a galvanic anode that can be embedded in the concrete. some people call them "hockey pucks". in my degussa book, they are called emaco corr-stops ci. perhaps these could be used instead of or in addition to galvanized couplers. i have used them for concrete rehab projects, but i don't see why they cannot be used for new construction when there is a situation like gumpmaster's.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
concrete beam repair huangyhg 产品功能分析 0 2009-09-08 11:41 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
calculating reinforcing actual stress huangyhg 产品功能分析 0 2009-09-07 10:03 PM
analysis of concrete slab huangyhg 产品功能分析 0 2009-09-07 11:35 AM


所有的时间均为北京时间。 现在的时间是 02:33 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多