几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 01:05 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 cone forming

cone forming
i have a cone to fabricate out of 3/8" plate. cone is approx. 15' vertical, 22' major diameter and 14" at the nozzle. is there a code or spec. available to assist in determining increments of break lines when rolling is not available?
check out our whitepaper library.
this is very basic geometry and is the the reason why they taught you geometry in university.
you will not find a code for this.
without rolling, it would have to be a hexagon approximation.
if you are building the cone to a specific code such as awwa, asme, or api, then you will need to follow the welding requirements for the code; however, the geometry is up to you.
since you will not be rolling the plates, you could consider the following procedure:
1. lay out the cone, unfolded...bottom width 44",top width 69', height 15'.
2. weld all sheets together as rectangular plates, then cut above dimensions out of welded plates.
3. stand on long width and work into circle using jigs and plate "dogs".
4. temporarily weld turnbuckle on outside of plates to pull together as closed circle.
5. working upward, using chains, "comealongs", plate dogs, and turnbuckles, close the vertical seam and weld according to specifications.
you should be able to do this with 3/8" plate. i know it can be done with 1/4" plate. it shouldn't be too stiff on that large starting diameter. it will be increasingly difficult as you move up the seam to the nozzle and might required strategic heat application with a "rosebud". we used similar procedures to build conical clarifier sections for package treatment plants in the 70's.
this is a large fabricated structure so use lots of safety precautions for stabilizing, lifting, and pulling the plates in place. use chains around the od rather than cable and weld temporary lugs around the diameter to keep the chain from sliding up as you pull on it.
there's not any fixed answer. you might talk to the people doing the forming and get their input.
if you make radial sections the full length, i would think 6" spacing on the outer end would be close enough. you can cut nested pie-shape plates out of rectangles. you may have to form the bottom couple of feet as a separate piece to keep the forming and weld spacing from getting too close together there.
you could make it in two or more courses so that the plates could be roll-formed to the radius. there's not a lot of motivation to do it one way or the other, other than available equipment and overall cost. cones are commonly done either way.
is this a ben and jerry's attempt at a world record?
mike mccann
mmc engineering
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete breakout cone area for group huangyhg 产品功能分析 0 2009-09-08 11:46 AM
detailing cone cutou huangyhg tec-ease(America) 0 2009-09-04 05:54 PM
【转帖】odgeconegetheight90 yang686526 DirectDWG 0 2009-05-06 08:33 PM
parameters definition of Auto-Cone huangyhg PC-DMIS 0 2007-11-27 01:15 PM


所有的时间均为北京时间。 现在的时间是 11:58 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多