几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 01:13 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 connection idea needed

connection idea needed
i'm looking for a simple method of connecting a single hss column to the center of a landing (c10) steel stairs. landing size is 36" x 36". entire stair system is braced against lateral movement.
what i had in mind was to run another c10 (perpendicular to the stringers) in the middle of the landing, weld a plate to the bottom of the c10 at midpoint. this would allow the column to be erected, then bolted to the plate on the c10.
any other suggestions?
check out our whitepaper library.
you did not provide information on the use of the stair nor the landing.
your concept/idea should work. i would avoid single column under the stair landing unless it is absolutely necessary. i call this design a single point failure in the making. consider the lateral stability of the stair and landing? you don not want users of the stair to get uncomfortable with flimsy and shaky stair. consider using two columns and support the stair stringers at each end. with single column you need to consider unbalanced stair loading plus any lateral loads.
i question the landing being 36鈥?by 36鈥?! most us codes (sbc, ubc, ibc, boca) that i am familiar with require, as a minimum, the stair landings to be as wide as the flight of stairs. if you consider one flight width and i am assuming users will need to transition to another flight, the landing should be twice as wide as the flights plus clearance for interior stringers.
good luck.
good point about using one column. i'll use two. the 36" x 36" landing is satisfactory since the stairs are 36" wide. i've tried to depict the flight arrangement below. users will go up one flight and then turn 90 degrees to the right to ascend to the top platform.
|--|--------
|--|--------
| |
| |
| |
| |
you could weld a 36" c10 c/w clip angles onto the face of the hss, and bolt connect the stringers to the 36" c10. the hss would have to be strong enough to handle any unbalanced loads.
if this is a 90 degree stair landing, your plate (or clip angle) on one side of the hss would work with one of the outside stringers, or two plates (or 2 clip angles) with both ouside stringers (corner post). the inside stringers would frame into an outside stringer and last one to an inside stringer.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
connection - is it pinned huangyhg 产品功能分析 0 2009-09-08 01:10 PM
bolted moment connection huangyhg 产品功能分析 0 2009-09-07 04:15 PM
beam to beam moment connection huangyhg 产品功能分析 0 2009-09-07 03:07 PM
1.3 connection factor for concrete huangyhg 产品功能分析 0 2009-09-06 10:25 PM
【转帖】ado.net access操作方法 yang686526 ObjectARX(VB.NET/C#) 0 2009-04-19 09:37 PM


所有的时间均为北京时间。 现在的时间是 05:41 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多