默认 construction joint wait time

construction joint wait time
hi everyone, i have a question regarding construction joints in concrete. i am working on a parking garage (256'x120') that has a 3.5" concrete topping slab supported by precast double t's. the contractor will pour the middle 1/3 of the topping slab first, then pour the two ends after that. my question is, how long should he wait to pour the ends after pouring the middle section? are there any recommended standards by aci for this issue? any help would be appreciated.
check out our whitepaper library.
analyzing your question, it seems you are trying to divide the garage into 3 segments?is it possible to pour them at one time then put sawcut joints per 8ft on both direction?
is there a really good reason for pouring the middle third first? my preference would be to pour the full length and establish the pour area on a dt joint. is this possible?
dik
i think the answer is that it probably doesn't matter. if you are casting a topping slab on top of the dt's (field topped), the underlying double tee's will restrain the topping slab from shrinking as it cures.
the contractor would like to pour the entire floor at one time. the engineer that originally started this job said that wouldn't be a good idea because the concrete will be restrained on all 4 sides during shrinkage and would likely crack quite a bit. so he required them to pour the middle section first, allowing it to undergo some shrinkage before pouring the ends. now the contractor is asking how long to wait before pouring the ends. we have saw cut joints detailed at all dt joints (8'-0" oc).
aci committee 224 has a list of resources for reducing cracking.
on crack sensitive structures (normally water holding), i try to wait 14 days between adjacent pours, but often times change that to 7 days at the contractors request. the least amount of time i wait is 3 days.
if you're really concerned about shrinkage, use low w/c ratio concrete and have the batch plant provide documentation of shrinkage rates for the proposed mix prior to approval.
typically continous bridge deckds are poured in this manner. waiting time specifed is 7 to 14 days, this always seems rather conservative to me. if this is a concrete slab, perhaps maturity meters could be used to moniter curing and reduce wait.
if you check aci, that procedure specified by the structural engineer is antiquated and not recommended. pour the whole slab at once and sawcut the joints where needed in combination with pre-set joints.
i agree with lkjh345 and ron. the topping slab will bond with the tee's and there won't be any global shrinkage due to the restraint. pour it all at one time and cut in your joints.
i've worked on projects where we successflly poured topping slabs on dt's in one reasonably sized large pour using concrete with a low w/c ratio and sawed joints aligned with joints between the dt's. bonding between the topping slab and dt's causes restraint everywhere, so pouring in sections doesn't really help control cracking as much as a low w/c ratio.
thanks all for the help...i appreciate it. i can definitely see how the dt's will restrain the concrete as people have noted.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
construction joint location in a two-way slab huangyhg 产品功能分析 0 2009-09-08 01:26 PM
construction joint design huangyhg 产品功能分析 0 2009-09-08 01:26 PM
construction joint 2 column face huangyhg 产品功能分析 0 2009-09-08 01:26 PM
concrete tanks - vertical construction joints in walls huangyhg 产品功能分析 0 2009-09-08 12:55 PM


所有的时间均为北京时间。 现在的时间是 10:31 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多