默认 crane vs. floor

crane vs. floor
this is a couple of months old, but i hadn't seen it before:
i prefer to keep the crane outside the building!!! i don't do these types of projects that often, but to park a crane of that size on a bar joist floor system with a thin conc topping seems a bit crazy.
i recently saw this. what i can't fathom is how there are no spreaders. even when a crane is used on the ground, you have spreaders under the outriggers.
what is even more baffling to me is that the shore does not seem to have buckled. i don't know if it was a case of the shore not being under the outrigger.
the slab looks paper thin to carry anything so monstrous. does anyone know what really happened?
i see steel roof deck and broken concrete.
no bar joists.
no rebar, except that used to hold up plastic flags.
am i being dumber than usual today?

mike halloran
pembroke pines, fl, usa
this is from an email sent out 1 week after the incident (and included the photos in the link):
"incident: friday morning 26/09/08 - castle hill/sydney
- 9 day old 250t leibherr crane (never used before)
- $4mill price tag
- failure of back propping beneath the 200mm thick concrete deck
- crane support outrigger punches through slab causing crane to lose balance and collapse across the site and onto adjoining property
- crane balanced in the air for approx 1 hour before entire rig & boom collapse completely across site and rigs falls through to the basement level."
perhaps 'failure of back propping' means the outrigger loads weren't located over the props, or the props fell over due to slab movement.

i work close to that area, well about an hours drive. anyway
the slab was a pt slab, it failed in punching shear.i re
from the first picture of the crane on the slab (2nd picture in the article), i thought it was a slab-on-grade.
then i scrolled down. it appears that the crane fell into the basement area. you can see a basement retaining wall in the background. it seems possible that the operator thought he was on the retained soil side of the basement wall but drove the crane past that into the elevated slab area.

according to a magazine i read recently about this crane punching through the floor,the crane company rep who went to assess the job instructed the client not to use rigger pads so that the load was spread directly onto the supporting columns underneath,wonder if he still works there?
well, when parked on a slab on metal deck (looks like long span epic-style deck), the spreader pads wouldn't really do any good, since you want the load to go directly through the concrete into the shoring towers below. from my perspective, this was crazy idea from the begining. but it still could have worked. i find it very surprising that the shoring towers were not laterally restrained in any way. i would have constructed fully braced towers under the crane, with x-bracing in 2 directions to ensure that the shoring towers were fully restrained. this way, any slight movement would not be an issue.
also, it could very well be that the outriggers were not located directly over the shoring towers, which caused the outriggers to punch through the slab.
somebody seems to have forgotten to do some basic engineering work. anybody interested in doing this type of engineering should study shapiro's "cranes and derricks".
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete pile sizing for 25-ton overhead crane huangyhg 产品功能分析 0 2009-09-08 12:25 PM
calculating the maximum floor load huangyhg 产品功能分析 0 2009-09-07 10:04 PM
bridge crane loads huangyhg 产品功能分析 0 2009-09-07 05:06 PM
allowable floor deflections versus workmanship standares huangyhg 产品功能分析 0 2009-09-07 10:58 AM
300 ton top running crane huangyhg 产品功能分析 0 2009-09-07 08:39 AM


所有的时间均为北京时间。 现在的时间是 11:25 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多