damaged field splice on steel bridge girder
on a bridge rehab job, a contractor recently removed the concrete deck for replacement. when sawing through the deck, they inadvertently sawed into the top plate at a field splice. the field splice is located near the point of inflection. the damage is on the side of the splice where the top flange is in compression. the damage consists of a 3" long cut tapering in depth from 0" to the depth of the top plate at the edge. the filler plate below the top plate was barely nicked. at this time, i don't have load data for the girders but for information, the girders are aashto m223 (astm a-572)steel with 1/2" x 54" webs and 13/16" x 15" flanges. the top plate is 3/8" x 12".
the question...short of removing and replacing the top plate, does anyone know any other suitable repair procedures. the state dot won't allow welding in a tension flange. the damage is very close but not within the tension flange.
thanks for your input.
check out our whitepaper library.
consider a splice plate welded on the flange over the damage. if you shape the ends with two fingers like an 'h,' you will increase the shear area considerably. of course, make the cross bar of the 'h' generous in length. proportions: finger width a, finger length 3-4 a,apace bet. fingers 1.5 a, cross bar length 4-5 a. back up with some basic analysis.
just fill the cut with weld.
if by filler plate, you mean the plate filling the gap between the two compression flanges i see no need for any repair. it's common that this is the only connection in the compression flange.
i would ask a couple questions before even contemplating a repair.
why is the splice there? if the top flange is always in compression it sounds like this may be a launch splice. if so, the fact it can no longer carry tension is irrelevant.
it sounds like a composite bridge with the neutral axis near the top flange. what is the contribution from the top flange to the overall bending strength? it is likely to be negligible.
there is a decent chance that the contractor got lucky and the damage has no impact on the strength of the bridge. it may be cheaper just to spec a weld repair, as civilperson suggested, than to spend the time finding out whether or not the ssplice acutally matters but if there are going to be issues with the dot over welding than investigating whether the top plate is needed may be worthwhile.
to answer gwynn's post, the bridge is composite with a concrete deck and the steel girders. the damage was done when removing the old deck for replacement.
the filler plate is required simply to make up the difference in thickness of the adjoined girder top flanges since the girder over the support requires a thicker top flange than the girder over midspan.
i've suggested to dot that the contractor can use a weld repair. i'll post their reply and the final solution later.
thank you all for your input.
gwynn's post sounds like management.
gwynn:
are you an engineer or a manager? or, more likely, an engineer pretending to be a manager?
just kidding!
pay no attention to my recently posted question. it has nothing to do with your project located in a high seismic area (really).
i have had many experiences with this situation. either saw cuts or hammer dings. in my experiences, usually the state dot requires the plate to be replaced. not because it is the only solution, but because they want to make sure that the contractor re
removing a plate simply to teach a contractor a lesson is not a good idea. with the deck removed, it is highly unlikely the plate can be removed with out supporting the joint. from what i understand, the splice is in compression under only the steel framing, but when the deck is poured, assuming a composite deck,the na moves up near the steel. gouge and weld the cuts. once the deck is cured, the concrete, which will be in compression, will carry most of the load across the splice, and since the splice will be near the na at that point, there will probably be little stress in the splice plate anyway.
if this splice is at the point of contraflexure as previously mentioned, then the application of load along the influence line can potentially subject this splice to stress reversal. dot in this case would be correct in requiring that the flange plate be replaced, since welding would seriously impact the fatigue life of the bridge.
thanks all for your comments. i thought i'd post dot's approach to resolving this issue.
dot's recommended course of action is to perform an analysis to see if there is adequate section remaining (after considering the cut plate) to carry the loads. if not, dot will allow either of the following solutions: 1) add an additional plate, with the appropriate development length on either side of the cut, or 2) replace the splice plate entirely. replacing the splice plate will most likely require temporary shoring of the girder.
dot won't allow filling the cut with weld material because it results in a category "e" weld situation.

sounds like the correct approach.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
china bridge fails huangyhg 产品功能分析 0 2009-09-07 11:33 PM
camber in steel box girder skew bridges huangyhg 产品功能分析 0 2009-09-07 10:16 PM
bridge loading factor huangyhg 产品功能分析 0 2009-09-07 05:12 PM
arema rating steel bridge load combinations huangyhg 产品功能分析 0 2009-09-07 12:50 PM
aashto steel girder splice design huangyhg 产品功能分析 0 2009-09-07 09:25 AM


所有的时间均为北京时间。 现在的时间是 05:37 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多