几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 10:26 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 engineer of record change

engineer of record change?
let's say engineer a signs and seals building design and is therefore the eor for the project. during construction the contractor makes a substitution which requires engineering approval. engineer a is on vacation (lucky guy) and engineer b designs the fix and issues with his seal on it. since both engineers work for the same company, are there any eor conflicts?
wondering how other folks lucky enough to have multiple pe's in the same office handle plan revisions, letters, etc., that come up on a project.
south carolina, and probably most states, solved this problem a few years ago. the company that the engineer works for must obtain a certificate of authorization (coa) from the state. this allows the company to purchase a numbered seal that looks similar to to pe seal - the company pays an annual fee for the coa - no testing involved. both the pe seal and the coa seal must appear on the drawings. it does not matter which individual pe seals the documents - because of the coa the company is still "on the hook" even if the individual leaves employment.
the only exception to the coa requirement is if an individual pe does business as a sole proprietor, s/he does not need the coa in this event.
i have a one person (me) limited liability company, but on the occasions when i need to seal drawings, i use both my pe seal and the company coa.
fss....would suggest that engineer a write a short note to file that engineer b provided the design for the field change request in his absence and that he has reviewed and concurs with the design (assuming he does!). this keeps the eor path clean.
in some respects it is like delegated work. in some states, the eor officially delegates certain work (steel connection design, supplementary structure design (canopies and other manufactured items), etc.)and receives and reviews the delegated function, then accepts as the eor. in your case it is like an unofficial delegation (he went on vacation and left engineer b to fend for him)so similar criteria would apply. the florida statute on engineering spells out the function and duties of each in a delegated situation.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
delegated engineer huangyhg 产品功能分析 0 2009-09-08 05:06 PM
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM
engineering change orders huangyhg tec-ease(America) 0 2009-09-05 10:38 AM
【转帖】engineering change orders yang686526 American standards 0 2009-04-29 07:52 PM


所有的时间均为北京时间。 现在的时间是 09:19 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多