几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 02:54 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 moment envelope for lh joists

moment envelope for lh joists
i have an old lh joist from the 1960s that i need to try and see if it matches some new loading conditions. i would like to check the moment envelope, but the 75 year joist manual doesn't seem to have any moment information for this kind of joist.
does anyone have any suggestions, or know if i'm just missing something in the 75 year old joist manual?
thanks

is the joist size listed in the catalog? does it have a standard sji designation? if so, you should be able to get an idea of moment capacity by using the uniform load to calculate the allowable moment. you then have 2 ways of analyzing the new condition: compare the original moments and shear to your new moments and shear. the other way is to field measure all the
it is a 32lh06. it is listed in the 75 year sji, but it doesn't give any information about the joist's moment capacity. i have used the loading information back-calculated the moment, but i was hoping to find something a bit more accurate along the length of the joist.
unfortunately, there is not enough budget in the job to go out and field measure and model the joist to get that kind of information.
thank you for the response!
in that case, i would use the first approach: create a spreadsheet and calculate the original moment and shear say at say 20 points along the joist and then compare those with that for the new loading condition. take a careful look at where the shears increase or where there is stress reversal. reinforce web memebers as necessary. if the chords are parallel and one piece then the moment capacity should be equal along its length until the end panel.
another option to reinforcing the existing joist would be to add a new joist alongside. i would often use a joist field spliced at the mid-span to make it easy to erect in an existing building.
good luck!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
moment distribution in continuous concrete members huangyhg 产品功能分析 0 2009-09-10 02:53 PM
design of moment connections huangyhg 产品功能分析 0 2009-09-08 05:43 PM
cantilever steel beam at column huangyhg 产品功能分析 0 2009-09-07 10:40 PM
beams shear splices vs. moment splices huangyhg 产品功能分析 0 2009-09-07 03:13 PM
aisc 13th ed. and cjp dw moment connections huangyhg 产品功能分析 0 2009-09-07 10:27 AM


所有的时间均为北京时间。 现在的时间是 05:58 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多