默认 solid post or multiple studs

solid post or multiple studs?
i have a client who is insisting that using multiple studs in a framed wall (residential construction) is the same as using a solid wood post that equates to the same dimensional lumber. for example, he insists that (2)2x4 spf#2 studs nailed together will support the same vertical or lateral loads of a 4x4 post.
how do i convince him that he is wrong?
thanks..
check out our whitepaper library.
wager him $1000.
are you sure he is wrong? if so, show him your calculations and your sources for your calculations.
compare with fabricated steel beams. i would have thought that it depends on the amount of nailing to take the horizontal shear for lateral loads and whether the nails can work loose. otherwise it should be the same for the same grade of wood.
(2)2x4 does not have the same dimensions as a 4x4. there's a start.
however, if you run the numbers, you may can get adequate strength from the doubled/tripled studs, and not need the 4x4s. that may be the point your client is making.
check the sub-heading built-up columns with mechanical fastenings pdf page 5 of 47
question: while 2-2x4s do not have the same axial load carrying capacity as 1-4x4 post, for conventional wall construction do bldg depts sometimes accept 2-2x4s as an option where 1-4x4 is required?
the allowable stresses for sawn lumber are dependent on the sizes of the lumber for one. as others stated above, the cross-sectional area of built-up columns is not equal to that of a sawn lumber column, for another. the strength of the built-up column for axial or lateral loads is also dependent on the connection of the individual studs to each other.
article of shear wall end post testing
i have never worried about the nailing together of the built up members. there is a nailing schedule in the building code that covers built up
henri2
nice link to a popular question. i usually let it go if the the double 2 x studs are blocked at mid-height for the entire wall.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
post-installed anchors huangyhg 产品功能分析 0 2009-09-15 01:50 PM
deck-railing post connection huangyhg 产品功能分析 0 2009-09-08 04:37 PM
adding studs to existing composite beam huangyhg 产品功能分析 0 2009-09-07 10:13 AM
about post installed in concrete huangyhg 产品功能分析 0 2009-09-07 09:28 AM
broken studs huangyhg 精密机械 0 2009-09-05 10:25 PM


所有的时间均为北京时间。 现在的时间是 12:49 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多