几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 03:28 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 bending momen

bending moment
hi ... sorry this is so simple for you lot but i never did well at mechanics and it was sooo long ago.
1) i know if i plant a 5 meter high post in concrete and apply a 1 kn horizontal force at the pole tip, the pole moment is 5 knm. that's easy enough, but what if i weld a right-angled fitting to the top and apply the load 1 meter down like so ...
_____a
| |
| |
| |<< 1 kn
|
|
|
|
|
|
|
|
------------ fixed in concrete
assume the right-angled fitting is rigid. please tell me how to calc the post bending moment.
2) and the second question i have (again using the 5 m high post fixed in conc) ... instead of a horizontal load (please disregard the 1 kn horz load shown in drawing), i apply a 1 kn vertical load at 1 meter out from the post at point 'a' in drawing. how is the post moment calculated? is it just 1 knm?
thanks!
bill

sabrepoint,
1)bending moment at base = 1.0kn x (5.0m - 1.0m) = 4.0knm
2)you are spot on, bm(base) = 1.0kn x 1.0m = 1.0knm
regards,
neilmo
i go for neilmo's solution.
it is quite easy to figure out for the cantilever. point a is experiencing a load of the 1 kn horizontal load plus a moment of 1knm in "clockwise direction". thus for the fixed end to reach equilibrium the original fixed end moment of (anticlockwise) 5knm has to offset the 1knm clockwise moment there.
if one sketch out the bm diagram then the short 1m
bbird,
nice explanation, better than mine.
neilmo
neilmo,
thanks for the complement. yours more concise. i wasn't going to bother at all but i thought the young engineer could do with a tip here.
nice thing about engineering is we can always agree on facts and physical laws.
bbird
they're both great ... thanks!
actually i had the correct answers as it turned out, but couldn't really explain. values used were hypothetical ... amongst other things i occasionally survey power lines. the first scenario roughly simulates the transverse wind applied to a wire on a suspension insulator; the second the dead load on the structure when considering overturning.
thanks again.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
bending moment induced by shims huangyhg 产品功能分析 0 2009-09-07 03:27 PM
beam strengthening huangyhg 产品功能分析 0 2009-09-07 03:04 PM
asymmetric bending in wood roof purlins huangyhg 产品功能分析 0 2009-09-07 01:47 PM
annular bending of stiffened ring huangyhg 产品功能分析 0 2009-09-07 12:12 PM
allowable bending stress in plate huangyhg 产品功能分析 0 2009-09-07 10:52 AM


所有的时间均为北京时间。 现在的时间是 01:16 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多