默认 cathedral hip roof

cathedral hip roof
curious question. i have not worked on hip roofs in a while. i have a cathedral hip roof on a residential two story + attic structure.
do the hip reactions at the ridge line have to be supported by the ridge beam or do their reactions brace each other back. there is only an elevated ceiling chord at +8'-0 above the bearing elevation. no floor at the bearing walls. the width of the home is 30'
any input is appreciated.
do you have a ridge beam or a ridge board? if you're asking about thrust, a ridge beam will take care of that, but a ridge board won't. if you have a ridge board, then your ridge board will act as a column and you would need a way to counteract the thrust at the top of the wall.
but i could be misinterpreting the question.
if you are using a ridge beam (not ridge board) and the ridge beam is supported by columns at each end, then you do not need to worry about thrust as the ridge beam and columns will prevent this.
if you don't have columns at each end of the ridge beam (you didn't mention it) then the problem is much more complicated and controlling roof thrust will be a critical component of the design.
unless cross ties are allowed at the top plate (say 48" o/c), i would strongly suggest adding the columns to avoid the thrust.
if it is a cathedral hip, then how can you have a ridge beam (supported by post at hip to ridge)?
the elevated ceiling chord (collar tie?) would have to bear the brunt of that hip connection load. perhaps someone could model this in 3-d frame analysis, and see what thrust occurs at the hips to outside corner top of wall.
ps...what is the roof pitch? with a steep pitch, the problem may go away.
thank you all. very helpful.
sacrebleu you confirmed my thought of doing a 3d model to analyze the thrust reaction.
i do have collar ties to work with at +8' above the bearing reaction at wall. i do not have any way architecturally to support the end of the ridge beam.
time to kick it back to the architect.
thanks again.
there's a thrust at the joint along the ridge beam. this is likely counteracted by the hip at the opposite end of the building. the ridge acts like a compression column between the hip beams. ensure the hips provide the thrust connection at their lower support. the thrust then in turn is resolved in the plate ties on the gable and rake walls. the plate is in tension to counteract the compression in the ridge and the hips. so also make sure the plates are continuous and designed for the tension stress as well as shear and bending from rafter reactions.
also- design/provide a corner strap at the double top plate corner intersection location.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cathedral ceiling rafter thrust load huangyhg 产品功能分析 0 2009-09-07 11:09 PM
building a flat porch roof huangyhg 产品功能分析 0 2009-09-07 05:29 PM
asce figure 6-10 wind loads huangyhg 产品功能分析 0 2009-09-07 01:22 PM
a flat roof huangyhg 产品功能分析 0 2009-09-07 09:05 AM
30 tilt-up and k-series owj roof collapse huangyhg 产品功能分析 0 2009-09-07 08:38 AM


所有的时间均为北京时间。 现在的时间是 09:52 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多