几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 01:39 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 contract documents

contract documents
inquiring about any comments on using ejcdc contract documents for engineer - owner / contractor or engineer - architect contracts?
or other standardized contracts?
thanks
most of my clients are architects and want to use the standard aia contract. i've received cold responses when i wanted to use either a different contract format.
i use the ejcdc documents whenever i can. they are "friendly" to engineers. the 1996 version is better than subsequent versions.
also, you can get permission to copy them...aia will not allow copying.
aia contract documents are one way. the architect way! i also agree with ron, they do not permit even the architect who buys them from copying them! they have to print originals; at least this is my experience.
it is my opinion that contracts do not have to be lengthy. there are basic clauses that must be covered. here is a short list that i have in mine:
1. name and address of parties.
2. name of project and its location
3. scope of services, the more detailed the better.
4. schedule, it is imperative to have a schedule or a statement as to the miles stones. if i do not have a schedule, we state that both parties will endeavor to expedite and mutually agree on dates.
5. deliverables, the more detailed the better.
6. assumptions and exclusions
7. fee and break down of design, cm and reimbursable.
8. billing and payment frequency.
9. venue of litigation (we specify that courts in our county will be the venue). this may become valuable if you have client who lives many miles or in another county.
10. attorney fees. if they do not pay and sue to collect, the client shall bear the cost of attorney fees. the attorney fees shall be over and above the design fee.
11. copyright to the plans. we insert this in everyone of our proposal.
12. detailed list of reimbursable.
13 signature blocks.
this is very simple and can be achieved in six (6) pages.
good luck.
regards,
lutfi
ron and lufti,
do either or both of you include a copy of the ejcdc contract with your fee letter to the client?
a few more that you may want to add:
clients responsibilities
insurance requirements
indemnification and limitations of liability
i do not use ejcdc contract. we have a contracts manager at our firm that handles all of our contractual matters. incidentally, he is a contracts attorney.
regards,
lutfi
we use modified case (council of american structural engineers) contract docs here. they are available from the american council of engineering companies (acec) web site. i like them because they are short ( typical agreemnt is 3 pages max for the smallish types of projects we do, <40k fee usually), and not slanted towards the architect as the aia std agreements are. case docs can be bought in word format so the agreements are easily modified as required, and printed as often as needed.

i have copies of the case contract documents. i use the case 6-1999 scope of services sheets as attachments to my fee letters. but when i've tried to get an architect to use any other document besides the aia, and even to get some of the wording revised, they refuse. it's the "if you want the work, sign the contract as-is" thing.
we get all types of contracts from larger clients. our "errors and omissions" liability insurance broker has an attorney on staff that reviews said contracts for free and sends us comments and notes how important they are to be changed. even "standard" contracts (aia, case, ejcdc, etc.) can contain language that may not be covered by your insurance policy. whatever you decide on, make sure you have it reviewed.
sduggan, gave you a star for reminding everyone:
let the engineers engineer the project.
let the lawyers and insurance people deal with the contract.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】numerous link errors on macosx 9xcode 2.50 yang686526 DirectDWG 0 2009-05-06 06:43 PM
【转帖】dwgdirect 1.14.01 now available yang686526 DirectDWG 0 2009-05-05 08:18 AM
【转帖】dumping the 鈥楴otes鈥?and 鈥楻eference documents鈥? yang686526 DirectDWG 0 2009-05-04 08:13 PM
【转帖】vba documents.open总是出错造成autocad崩溃,请教达人 yang686526 数据库ObjectDBX 0 2009-04-28 10:10 AM
vba documents.open总是出错造成autocad崩溃,请教达人 yang686526 ObjectARX(AutoLISP) 0 2009-04-25 09:06 PM


所有的时间均为北京时间。 现在的时间是 04:52 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多