几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 02:00 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 core drillinsert spacing

core drill/insert spacing
hello all, that includes you casseopeia,
i will ask the structural on this project this question, but thought it would be good to get this forum's input.
i have a situation where i will be penetrating a poured in place basement wall with a large quantity of conduit. these will mostly be 4" conduit, but i also have some 6" conduit and a few smaller ones. in one location for instance i have 16-6" conduit entering a basement from an on-site manhole. i intend to penetrate the wall either with core-drilled holes or by using a cast-in-place pvc insert. the 6" rigid steel conduit requires a 10" opening to allow the installatio of the link-seal assembly. i have given a sketch to the structural engineer indicting these penetrations in a 2 wide x 8 high configuration. so he will frame out a 10'-6" h x 2'-6" wide 'window' without rebar for the penetrations if i core drill, or we will cast the inserts in place.
ok, my question is this. i have indicated a 6" space horizontally and vertically between each 10" penetration. i assumed that this would be sufficient to allow working space to tighten the link-seals and prevent spauling of the openings if cored. what would your recommended minimum spacing between core-drilled openings be? would that change if we used cast in place inserts?
thank you for your patience, regards,
eejaime


i would first see what the general spacing of the reinforcing is in the vertical and horizontal direction and try to accommodate that such that you would have a bar between each opening.

in any case for most basement walls/mats at these hole sizes no particular problem should develop; how less if acting with care and attention to detail. so continue in consultation with the director of the structural works and go ahead.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
core drill concrete for testing huangyhg 产品功能分析 0 2009-09-08 02:00 PM
cmu block walls with hollow core slab - how high huangyhg 产品功能分析 0 2009-09-08 09:29 AM
anchor bolts spacing basement walls huangyhg 产品功能分析 0 2009-09-07 11:53 AM
profile of a surface on a honeycomb composite core huangyhg tec-ease(America) 0 2009-09-05 12:21 PM
【转帖】profile of a surface on a honeycomb composite core yang686526 American standards 0 2009-04-29 09:27 PM


所有的时间均为北京时间。 现在的时间是 05:44 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多