几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 05:06 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 delivery of shop drawings

delivery of shop drawings
i have a question, when the shop drawings arrive at the architect office from the general contractor, who is responsible for getting those shop drawings to the structural engineer, is it the architect responsability to send them to our office or do we need to go get them.
thanks for your comments.

check out our whitepaper library.
have the general send a non-official set directly to your office to accelerate the review process. (then follow the transmittal process from the general -architect/engineer/architect/general/subcontractor).
i would hope that the archie is competent enough to forward them to the appropriate reviewer.
the reason that i ask, is that we have work with an architect for a few years now, but every time there is a structural submittal they just call and tell us that there is a submittal for us, but they do not deliver the submittal, they want us to go pick it up. and if we do not pick it up like in the next couple of days then they start calling and getting upset for not picking up the submittal.
pick it up and charge them for the time. make sure the charge is seperated out.
the architect is your client.
with that in mind - what is the good business practice to follow?
either talk to them about it or include it in your fees.

most everything we get today is electronic. is it possible to require electronic submittals where you get a copy. this speeds up the whole review process.
send a courier to pick it up and bill them with 10% markup on the delivery charge.
when you have reviewed the shop drawings, call the architect and tell them they are ready for him to pick them up.
imho the specifications should cover how shop drawings are handled. i've dealt with engineers who refused to approve shop drawings, even though the specifications rerquired them to do so. i've dealt with engineers who take 15 working days to return shops. that is ok if it is written in the specs. however when its not and a job is a fast track project it really slows down delevery when the engineer takes three weeks to return the drawing.
however i think jae is right. if they were my client i would ethier have some one pick them up or request that the arch. courier them to me at my expense.
if the arch is the prime professional he should get them to you. he has a responsibility to his client to coordinate submittals and responses.
that said if he is refusing, you should arrange to get them and bill the project.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
copied cds as shop drawings huangyhg 产品功能分析 0 2009-09-08 01:56 PM
certify fabrication drawings huangyhg 产品功能分析 0 2009-09-07 11:17 PM
certification of shop drawings huangyhg 产品功能分析 0 2009-09-07 11:16 PM
cad files for shop drawings huangyhg 产品功能分析 0 2009-09-07 06:06 PM
bim and dimensions huangyhg 产品功能分析 0 2009-09-07 03:49 PM


所有的时间均为北京时间。 现在的时间是 06:15 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多