几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 11:32 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 london theater ceiling collapse

london theater ceiling collapse
i'd be curious to hear from some of our british friends what happened here? has there been any more news of the cause? (seems like a pretty recent renovation).
(from the bbc): theatre shuts after ceiling fall


police and ambulance staff were called to the theatre
a west end theatre has closed for two nights after bits of the ceiling fell down during a performance.
the theatre royal haymarket has cancelled monday and tuesday's performances of when harry met sally after the incident on saturday night.
about 13 people suffered mainly cuts and bruises when plaster fell into the auditorium towards the end of the show.
one woman is still recovering in hospital and the health and safety executive is investigating.
the health and safety executive has said the chandelier did not drop four foot, as had been originally thought.
"nothing happened to the chandelier. it looked as though it had dropped but it hadn't," a spokesman said.
theatre chairman arnold crook said staff were extremely concerned about what happened.
he added: "we extend our sympathy to all audience members affected. our experts are, at the moment, investigating the cause of the incident."
it is expected performances will resume from wednesday.
the theatre has confirmed that the show's star, luke perry, jumped into the auditorium to help get people out of the building.
producer james tod said one of the reasons he had chosen the theatre royal was the "renowned beauty" of the auditorium - the theatre's £1.3m refurbishment was completed in 1994.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
is ceiling part of the roof system load duration factor 9wo huangyhg 产品功能分析 0 2009-09-09 09:27 PM
disproportionate collapse huangyhg 产品功能分析 0 2009-09-08 06:57 PM
disproportionate collapse - masonryhollow core huangyhg 产品功能分析 0 2009-09-08 06:57 PM
big dig boston ceiling collapse huangyhg 产品功能分析 0 2009-09-07 03:46 PM
beam to support ceiling joists huangyhg 产品功能分析 0 2009-09-07 03:08 PM


所有的时间均为北京时间。 现在的时间是 08:36 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多