几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 06:54 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 ridge beam suppor

ridge beam support
i would like support a ridge beam (wood) in a cmu pocket. the cmu is reinforced and is also the wall of a fireplace. this is new construction. cmu/veneer is on an exterior gable wall; ceiling is vaulted, fireplace is 7' wide through roof. the support location is 12' above the firebox. code requires 2" clearance at sidewalls, 1" clearance through roof, and allows combustible materials (mantle & trim) 12" from firebox. i am looking for opinions regarding the code and clearance to combustibles.
thanks

with the chimney so big, and presuming it's designed and detailed to be a structural support for the load of the ridge beam and as long as you're well clear of the flue, i don't think you have a problem. my interpretation of those clearances is that they are more intended for smaller chimneys -- an 8x8 flue liner surrounded by 4" brick, for example. seems every jurisdiction around me has a different interpretation of these clearances, though.
ctcray,
thanks for your response.
in the irc 2006 chapter 10 r1003.18 exceptions 2. states that combustibles cannot be in contact with the masonry less than 12" from the flue lining. my clearance is greater than that.
i anticipate questions from local code officials when submitted. i am hoping to have enough convincing information. often interpretations are subjective.
wood on concrete usually has to be treated....
might need a steel shim between cmu and beam.. check your local code.
miketheengineer,
i plan to anchor the beam with a steel bearing/connector to the bond beam at that elevation.
thanks for the response.
it may be worth a call into the building official/plans examiner to discuss your interpretation - especially if you can fax in a sketch so they can see what you are talking about. gives them time to think about it and look it up in the code before he or she gets back to you.
don phillips
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
question regarding floor support beam installation huangyhg 产品功能分析 0 2009-09-15 03:58 PM
high ceiling building huangyhg 产品功能分析 0 2009-09-09 04:21 PM
cross beam bolted connection huangyhg 产品功能分析 0 2009-09-08 03:55 PM
beam strengthening huangyhg 产品功能分析 0 2009-09-07 03:04 PM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM


所有的时间均为北京时间。 现在的时间是 04:13 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多