几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 07:35 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 rotating skyscraper in dubai

rotating skyscraper in dubai
structural fellows,
you may have heard the news of rotating skyscraper in dubai, the world first dynamic architecture. see from the link:
does anyone feel sorry for the structural engineer on that one?
this is a job for a mechanical engineer!
does this mean that structural engineers will become mechanical engineers or will be replaced by mechanical engineers?
could the wheel be the 'world's first dynamic structure' ?
why does dubai need such a structure ?
why does any place need a structure like that???
seems they found an architect with as big an ego as their pocketbooks.
easy 3-step job.
1. buy existing skyscraper
2. add alcohol
3. repeat step 2.
the projected plans are amazing, but there are few buildings that would out-do the burj el arab(?) hotel there that was opened a few years ago. the hotel is the only 7-star (not just 5-star) in the world. i was lucky enough to get a personal tour without paying the rediculous amount ($50?) to walk inside.
the rotating building poses unique problems that will not be experienced except in some seimic solutions.
if you do work there, you better be ready for a fast track, irregular work and ability to respond to problems and changes quickly.
the ability to solve problems seems to overshadow the cost if the scedule is not compromised. pride is important and will be paid for.
the residential development off shore is truely amazing.
if you have a chance, take a look at the timeline of construction of dubai for the past 5 or 10 years. there is a slide show that i will try to find. i have the ppt presentation that i can post once i find out how to.
dick
i would think that a structural engineer would design the lift shaft/spine and the moving parts would be designed by a mechanical engineer.
i expect that the residents will get seasick every time there is a big wind due to the lateral translation and rotation combined.
this will be like designing a new type of jetplane but without the same amount of lead time. i wouldnt touch it with a 10'(3.05m) pole.
csd
this is simple... just use a bunch of hoverboard pads like they did in back to the future ii, and "rosie" from the jetsons could clean the apartments too!
i am not sure about firsts. i recall having dinner in cincinnati in 1986 at the top of the crown (i think that was the name) where the whole resturant rotated like once every 15 or 20 minutes or something.
don phillips
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
rotating bending fatigue stress range huangyhg 产品功能分析 0 2009-09-15 07:34 PM
dubai sand not suitable for concrete huangyhg 产品功能分析 0 2009-09-08 07:53 PM
diamond ring hotel in dubai huangyhg 产品功能分析 0 2009-09-08 06:34 PM
【转帖】rotating 3d yang686526 DirectDWG 0 2009-05-07 03:12 PM
【转帖】rotating a drawing view yang686526 SolidWorks二次开发 0 2009-04-13 01:59 PM


所有的时间均为北京时间。 现在的时间是 05:57 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多