几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 04:10 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 uckpointing information

tuckpointing information
i am looking for information regarding the methods and materials used in tuckpointing. i have found some at the pca in their "trowel tips". but, what i am looking for is a specification to be used for the work in the field that would outline the depth of cut, cleaning of the joints, mortar mix, mortar additives and clean up. thanks in advance for any help!
i'd look in astm's and army corps of engrs. manuals.
tuckpointing, originally, was a means of using a 'high quality' weatherproof mortar, for the outer 1/2" - 1" of the mortar joint and to provide a medium that could be tooled in a decorative fashion or to provide a finer finished work. it allowed the 'master' or the skilled 'journeyman' the opportunity to do this work at their leisure. in later times, it has become synonymous with repairing existing masonry mortar joints.
i'm not aware of any 'fast' rules about the amount of material to be removed. i generally specify that all loose or unsuitable mortar should be replaced and, to maintain a 'visual continuity', usually stipulate that a minimum of 1/2" be replaced. otherwise the repair can look 'spotchy'.
it's important to match the mortar to the work being undertaken.
in general, tuckpointing for remediation is done using the following procedure:
1. using tuckpoint grinder, remove outer 1/2-inch of mortar depth (depth may be increased to account for desired finish, to improve strength, or replace bad mortar.
2. clean all joints with water and allow to dry.
3. using a polymer modified mortar, re-point the mortar and finish as desired.
the canadian standard csa a371 has some excellent information regarding repointing masonry. i agree in general with the points raised above; however, i generally specify that if a joint needs to be re-pointed (cracked, eroded or displaced mortar) a minimum of one inch should be removed or to the depth required to obtain sound substrate. in addition, caution is required on the type of mortar used to repair the joints. use of too hard a mortar or implementing polymer may do more harm than good. too much cement increases shrinkage, creates edge loading and aggravates water penetration. the mortar should always be softer than the masonry. i generally use a weaker type n mortar or even type o for re-pointing.
jw
hi,
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
bim 9building information modeling0 huangyhg 产品功能分析 0 2009-09-07 03:48 PM
【转帖】otally New To All Of This yang686526 DirectDWG 0 2009-05-07 05:10 PM
【转帖】polyline solid fill information yang686526 DirectDWG 0 2009-05-06 10:14 PM
【转帖】geometry related questions yang686526 DirectDWG 0 2009-05-05 11:12 AM
【转帖】dwg without layout extension information yang686526 DirectDWG 0 2009-05-05 08:11 AM


所有的时间均为北京时间。 现在的时间是 08:36 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多