默认 cmu archingthrust; deep lintels

cmu arching/thrust; deep lintels
the caveat to using arching action is having not only enough wall height over the opening, but also having enough wall on either side of the opening to resist the resulting thrust. can you resist this thrust with a tension tie--say, the steel in the lintel--instead of relying on the jambs? this is what i understand dik to say in
i am not sure you can get the required development length of the lintel bars if you are using them as a significant tension tie near the end of a wall. the thrust will try to rip the final 8" (or whatever you have left between the edge of the opening and the end of the wall) off of the lintel bar.
you could use a couple concept but you have to transfer the shear flow through the bed joints, normally there is face shell bedding only and there is also usually the wind/seismic shear that is coming through the bed joints down the wall. you really should look at combining those shears if you used that concept.
i generally do not consider arching unless i am trying to prove an existing condition works. i also would not consider arching if the wall is stack bond or there are openings or control joints in or near the area resisting thrust.
i use arching when i can, but i always use standard lintels without any special coupling action going on. the masonry construction is pretty crappy where i live, so i try to keep things simple.
{cracks open another cold, cold beer}
in addition to using a horizontal tie, i've treated the lintel as a propped cantilever too; both work. i don't think so much as it transferring shear, but transferring compression forces. although for critical areas, i usually grout cores, the wall behaves pretty much the same even if the voids aren't filled.
another thing to consider is that with arching action, there is a higher concentration of force at the ends of the arch and the masonry has to be checked for this additional compressive force.
dik
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
can brick ties be attached to existing cmu backup huangyhg 产品功能分析 0 2009-09-07 10:21 PM
can 4 cmu be designed as a structural interior partition wa huangyhg 产品功能分析 0 2009-09-07 10:19 PM
bar splices in cmu for ibc are too much huangyhg 产品功能分析 0 2009-09-07 02:19 PM
8 cmu placed w incorrect horizontal joint reinforcing huangyhg 产品功能分析 0 2009-09-07 08:57 AM
15 ft cmu chimney design method huangyhg 产品功能分析 0 2009-09-06 10:34 PM


所有的时间均为北京时间。 现在的时间是 08:14 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多