几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 01:43 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 contractor-fabricated gl arch

contractor-fabricated gl arch
have a proposed job to look at involving a built-up wood arch spanning 48 feet with a 24 foot high ridge, spaced at 12' centers forming a kind of quonset structure.
the contractor/owner wants to fabricate it on site using df#2 material with special jigs, glues, bolts, and construction equipment. considering the low stress grade of df#2 for 1" members, has anyone found any allowance in the codes/standards, other than testing, to increase the bending stress above the standard 1000 to 1200 psi range, into the range of a laminated gl beam - 1600 to 2400 psi? i highly suspect not without special testing, inspection, and certification, but i thought i'd ask anyway.
mike mccann
mmc engineering
check out our whitepaper library.
mike,
i believe that the only stress grades that go above fb=1500 psi is machine stress rated (msr) lumber. the design values are found in mechanically graded dimension lumber (table 4c in the 2001 nds supplement). but, i don't know if they run msr for 1x wood.
you might give the apa in tacoma a call at (253) 620-7400
thanks - i'll give it a shot.
mike mccann
mmc engineering
i would not be too comfortable with an owner/contractor fabricating these...too many variables beginning with glues, temperature, humidty, etc - much less having a good design.
douglas fir is easily upgraded to higher stress allowance with scarfs and finger joints to eliminate checks, knots and voids. a laminated sample tested to ultimate and then used at 1/3 the test strength would be appropriate,(flexural of extreme fiber).
i agree with miketheengineer. most people under estimate the amount of clamping force required to develop the proper glue bond in a laminated beam. i would be skeptical that a contractor field fabricating laminated beams would be able to develop the proper bond.
for 40' arches spaced 12' o.c. i am surprised that anyone would try to field fabricate the arches. glulam plants are set up to do this sort of thing on a daily basis. it would be hard to imagen that the contractor could same money by gluing up the arches in the field. particularly now with our slow economy, plants should be hungry for work.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
brick masonry arch design and evaluation huangyhg 产品功能分析 0 2009-09-07 04:51 PM
brick arch huangyhg 产品功能分析 0 2009-09-07 04:47 PM
brick arch floors huangyhg 产品功能分析 0 2009-09-07 04:46 PM
what is arch e size huangyhg tec-ease(America) 0 2009-09-05 01:55 PM
【转帖】what is arch e size yang686526 American standards 0 2009-05-04 11:15 AM


所有的时间均为北京时间。 现在的时间是 11:57 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多