几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 04:20 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 wo story shearwall plywood not on the same side

two story shearwall plywood not on the same side
contractor have asked me, if possible to place the plywood for the first floor on the inside of the wall up to the bottom of the floor joist, and the plywood on the second floor on the outside of the wall but extend it to the top plate. the shear walls are over each other and have the same width. has anyone had any experience like this or have any comments? thanks everyone.
i don't see why it would be a problem. the only structural issue at hand is to make sure you properly anchor the 2nd floor shearwall to the 1st floor shearwall, based on the uplift force from the overturning moment on the shearwall due to lateral load on the 2nd floor. basically, i don't think anything changes when you change the side the plywood is on.
if its an exterior wall i would prefer to see the sheathing on one side. the strapping and plates would allow for a continous shear plane and direct axial load path. additionally the exteriod drainage path is better established.
cheers
we encounter this occasionally. if there is a hold down strap at the second floor to first floor shearwall, it nails to a double stud anyway and isn't affected by which side the plywood is on.
the important thing is to get the shear thru the double top plate of the first floor wall (plywood on exterior from that level upward, and on interior at first floor level).
thank you all, my concern is that hold down strap from the second floor or the first floor will not be nailed to the same surface ( upper on plywood, lower on the stud or 4x4), the other concern is the shear flow would have to cross the double top plate from one side of wall to the other side of wall.
i might be more concern than what i should be, but it is good to know the answer so if i face it again, i do not have tobe concern of. thanks for all the inputs
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
shearwall heigh huangyhg 产品功能分析 0 2009-09-15 10:09 PM
masonry shearwall - 2 story with perforations huangyhg 产品功能分析 0 2009-09-10 12:49 PM
light gage steel studs - bearing on plywood huangyhg 产品功能分析 0 2009-09-10 10:21 AM
bt limits huangyhg 产品功能分析 0 2009-09-07 05:24 PM
apa plywood or apa rated sheathing huangyhg 产品功能分析 0 2009-09-07 12:28 PM


所有的时间均为北京时间。 现在的时间是 12:01 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多