默认 cip pile tension connection to base slab

cip pile tension connection to base slab
when making a tension connection between a cast-in-place pile and the base slab with rebar dowels is there a recommended safety factor? aci 543 seems to indicate using a factor of 0.5 when cacluating your tension steel. aci 318 and 350 call for 0.9 for tension connections. i am also looking for some recommened details. i am considering bent rebar with the required emebedment and brought up past the bottom mat or a headed plate with a heavy plate washer. does anyone know of any reasons to use one over the other or maybe a third type that i haven't mentioned?
thanks!
find a job or post a job opening
factors of safety depend on what kind of loads you're looking at. seismic is different than service.
typically in bridges we extend the reinforcement to the top mat in order to transfer the forces into the slab. hooked or headed bars work well to develop this. it seems to me that a plate wouldn't be necessary.
apriley,
thank you for the quick response. i probably should not have used the term saftey factor. i am referring to the phi factor for calculating the required area of steel to resist tension. the controlling tension load by far is due to uplift from groundwater and is going to be around 43 kips.
it makes sense to bring the hooked bars up past the top mat as well as the bottom. for constructibility reasons the contractor has asked if they can go to the bottom side of the top mat. if the bar is adequately developed into the slab does it matter if it does not extend above the top mat? i know you will have a much lower pullout strength but is there anything in the codes that does not allow this?
thanks,
waytsh
ok, makes sense. i design using aashto so i won't be of much help for your fist question.
as far as development into the slab, we usually go to the bottom of the top mat as well. the port of los angeles has developed a detail using short drop-in headed bars lapped with the pile reinforcement (takes care of constructability) to develop all the way to the top, but i think that's more important for seismic loads. i think developing as close as practicable to the top is sufficient. i don't know of anything in the codes you're using, though, that would validate this.
waytsh,
i think that 0.9 is the phi factor that you want to use.
as for whether or not you take your pile steel above the top matt i think that it's all about developing those bars to resist pullout. in that regard, you've got three options:
1) take the bars to the top and devlop the usual stut and tie model for something like this (pile cap as beam with top & bottom chord.
2) terminate the bars at the underside of the top mat and count on concrete cone pullout resistance to keep the pile rebar anchored.
3) develop a more sophisticated strut and tie model that takes advantage of rebar elsewhere in the pile cap (rebar other than the top mat wich you're not engaging directly). this can often be done. you just have to be meticulous in following your load path through. in my experience, this leads to some bottom reinforcementconcentrated over the piles.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
child-friendly column base connection huangyhg 产品功能分析 0 2009-09-07 11:31 PM
can prestress wires in pc. pile sustained tension in pier huangyhg 产品功能分析 0 2009-09-07 10:23 PM
basketball court slab on grade huangyhg 产品功能分析 0 2009-09-07 02:40 PM
basement slab on grade design huangyhg 产品功能分析 0 2009-09-07 02:34 PM
add steel base plate for new column to existing post-tension huangyhg 产品功能分析 0 2009-09-07 10:10 AM


所有的时间均为北京时间。 现在的时间是 07:29 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多