默认 can prestress wires in pc. pile sustained tension in pier

can prestress wires in pc. pile sustained tension in pier
could anyone has idea about using prestress wires in pc. pile to transfer tension in pier. my colleague in office say that in case of piles subjected to tension due to wind such as in peb building were penetrated too short and dowel have to cut out to reach design pile top level, we can sonsidering to use their prestress wires to transfer this force. for me i'm disagree with him.
did somebody out there has experienced with this. in case of can, how can we calculted embeded length to concrete. i cant find some helpful sources in aci for embedded length of these wires except doformed and weld wire fabric.
assume that a pile was subjected to 16 kips in tension and no problem from soil only the way to transfer tension through pile only.
thanks.
check out our whitepaper library.
gtoyo,
we have used the prestressing strands (3/8" to 1/2" in diameter) in the concrete piles to transmit the tension forces from the pile cap to the piles. we specify the additional length of pile needed to provide the length of the strands required to transmitt the tension forces by bond with the concrete. the top of the pile has to be cut after driving, without damaging the strands. the strands have to be supported from the pile cap rebars to insure they extended into the pile cap and do not lay flat on the bottom.
as an alternative, rebar dowels could be epoxy set in drilled holes in the top of the pile.
regards
aef
dlew
in case of pc. wires , do you have an idea how to calculate development length to tension force.
gtoyo,
a prestressing strand manufacturer could answer the question about the developing length beter than i could. it has been quite a while since i designed my last transmission tower foundation using prestressed concrete piles.
regards
aef
if you have exposed the wires anyway, why not simply tension them and have anchorages in chases cut in the sides of the pile caps?
abhijeet oundhakar
design engineer
rashid al owais engg. & consulting
sharjah, uae
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
augercast pile reinforcemen huangyhg 产品功能分析 0 2009-09-07 01:54 PM
anchor bolt uplift development lentgh in piers huangyhg 产品功能分析 0 2009-09-07 11:49 AM
acip pile reinforcing design huangyhg 产品功能分析 0 2009-09-07 10:07 AM


所有的时间均为北京时间。 现在的时间是 02:32 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多