默认 piled ground beam formwork

piled ground beam formwork
we normally specify on the drawings that the sides and bottom of the ground beams have a type a finish to bs8110,
thus some sort of formwork is required. typically permanent forms such are cordeks groundform system or similar would be used.
a client, after talking to a contractor, has come back with the question do we need to use formwork or can we just cast directly against the ground, which is stiff clay (no heave precautions necessary).
personally i dont like this as the concrete may escape into the surrounding ground (although unlikely as this is clay). also bits of clay may fall into the concrete contaminiating it. there may also be issues with cover to the rebar. what are you thoughts on this. do you allow ground beams to be cast directly against the ground and do you see any other potential problems in doing this.
thanks
mostly sand where i am but always formed sides with bottom cast against soil.
i wouldn't recommend it due to the contamination risk.
as above, no problems for the bottom form being deleted, but with extra concrete cover for extra tolerance.
we do it all the time in clays and silty clays. "neat earth forms" is the term used. trenched footings are what we call them.
here in the states, when we do this, it then requires 3" clear cover on any reinforcing bars due to irregularity of the earth.
if neat earth forms can't be achieved, then of course supplemental formwork is required.

we have done trenched footings; usually the footing/wall is combined and reinforcing is minimal. often dowels are placed and the top portion (foot or so) is formed. i am not familiar with some of your terminology, but when you say 'ground beams', i think of grade beams. these are usually heavily reinforced and this method (trench and pour) is more difficult, ie. how to support and maintain reinforcing location, and cover. in this latter case i agree with comments that bottom can be cast against earth and sides formed.
we cast against the bottom and sides all the time where i come from. as long as the soil stands up, is not moisture sensitive as to volume change, and the appropriate cover is used, there is no problem. weather permitting, of course. taking the reinforcement out to clean the excavation after a downpour is not fun.
we generally put 50mm blinding concrete in the base. if casting the sides against bare earth bs8110 calls for a minimum of 75mm cover to reinforcement.
if you are checking the reinforcement on site, you would need to keep an eye on the cover.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
help with composite beam huangyhg 产品功能分析 0 2009-09-09 04:15 PM
cross beam bolted connection huangyhg 产品功能分析 0 2009-09-08 03:55 PM
cantilevered steel i-beam capacity huangyhg 产品功能分析 0 2009-09-07 10:45 PM
beam strengthening huangyhg 产品功能分析 0 2009-09-07 03:04 PM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM


所有的时间均为北京时间。 现在的时间是 03:42 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多