默认 provision for future expansion in rcc frame structure

provision for future expansion in rcc frame structure
i have a reinforced concrete frame structure with three bays, however, there is provision in plan for constructing further three bays in future. my approach is to construct three bays, leave about 3 inches (just like expansion joint) and construct the other three bay frame when needed. however, combined foundation for last column of this frame + first of future frame should be provided now.
is this the correct approach, or some other method should be adopted to avoid duplication of columns at interframe gap.
e.g, simply supporting beam on end column etc.
please comment.
first decide if you need the expansion joint in the building. two reasons for an ej would be the length of the building and whether the foundation system might have significant settlements upon its construction. in most cases there is a concern that new construction will naturally deflect some amount. the question is whether a tied-in addition can endure those settlements.
if an expansion joint is required - yes, design the end footings for the future loading. if an expansion joint is not required - then the end columns and footings should be designed to support the future loading.
for a connection to an end column, you could provide a corbel with extended rebar - or use threaded couplers at the corbel top face - and go from there. other option would be to use a stepped column - i.e. the lower column is wider than the upper and creates a ledge for the future beam to rest on.
precast concrete building details could be used ie,
- corbel, to form halved joint with future beam
- steel connector protruding from column face, hidden within beam section
- rebated column face and cast-in threaded inserts for rebar into the beam
it is not very efficient to plan for a double column.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
lateral force 2 expansion joint frame huangyhg 产品功能分析 0 2009-09-10 09:40 AM
expansion of single storey steel frame industrial building huangyhg 产品功能分析 0 2009-09-09 09:12 AM
expansion joints in concrete tanks huangyhg 产品功能分析 0 2009-09-09 09:09 AM
expansion joint in underground structure huangyhg 产品功能分析 0 2009-09-09 09:07 AM
equipment frame analysis huangyhg 产品功能分析 0 2009-09-08 10:42 PM


所有的时间均为北京时间。 现在的时间是 10:58 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多