默认 uniformly loaded slab on grade

uniformly loaded slab on grade
i came across a situation which seemed simple but apparantley i have no references on the proper way to do this. i have a slab on grade that needs to be designed for a 460psf uniform load. im specifying 6" porous fill under on controlled fill or original soil. i will spec contraction joints 20' max. it is a small area. it is a pit for a prefab "pool treadmill". it will not be exposed or walked on so minor cracking is not a huge concern.
i need advice or references on thickness and reinforcement.
thanks
check out our whitepaper library.
one of the best books for slab-on-grade design is "designing floor slabs on grade" by ringo and anderson. one of their major concerns, in addition to the applied loading, is the subgrade soil conditions. is your subgrade a granular soil, a plastic clay or a compressible clay?
a loading of 460 psf on a dense, granular subgrade is not too bad, but on a compressible clay it could lead to continual settlement problems.
so, first find out from your geotechnical engineer the subsoil charactoristics and capacities, then design your slab.
differential settlement under your pool treadmill could ruin your pool!
i recommend that your contraction joints be placed at 2.5 times the slab thickness in feet (i.e 2.5x6 = 15.0 feet). this is a good rule of thumb for joint spacing.
i ditto jheidt's input regarding the reference.
i'm not a structural so correct me if i'm wrong, isn't the spacing of contraction joints dependand on your mesh strength, material the slab is placed on and the tolerance for displacment at the crack?
ken
slowzuki - for unreinforced concrete (which this seems to be), i concur with lutfi. if joints are spaced too far apart curling becomes excessive. this causes unpredictable cracking.
jjeng2 - as always,be sure to cure the slab thoroughly (preferably wet curing to minimize curling).
you might want to consider having thicker edge footings (turned down footings). this will help the curling issue because if you have a slab of uniform thickness, the edges dry first and begin to curl. if you thicken the edge, then it dries more uniformly and it won't (or shouldn't) curl.
i'm not sure i subscribe to mjflorio's theory regarding a thicker edge footing (turned down footing) at a slab edge as a "cure" for slab curling.
first of all, if this were a cure, then each construction joint in a large floor slab would need a thickened edge. this would add a significant cost to floor construction.
secondly, not all floors curl. from my experiance, floors that are wet cured and allowed to slowly loose their excess moisture, curl less. the key seems to be a more even drying of the slab through it's thickness. if a vapor barrier is used under the slab (which i am in favor of) the process takes longer, but it can be done. one thing that seems to help even out the rate of moisture loss is the use of a high solids curing agent on the floor slab.
it also depends on the pour size. i reread the original post, and i believe my comment doesn't apply because of the relatively close spacing of joints. but for large pours like that at home depot or a warehouse, this does present a solution.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
slab-on-grade w embedded rails huangyhg 产品功能分析 0 2009-09-15 11:30 PM
slab on grade with tank slab huangyhg 产品功能分析 0 2009-09-15 11:25 PM
slab on grade problem huangyhg 产品功能分析 0 2009-09-15 11:24 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
grade beam detail question huangyhg 产品功能分析 0 2009-09-09 02:57 PM


所有的时间均为北京时间。 现在的时间是 01:03 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多