默认 slab on grade with tank slab

slab on grade with tank slab
i was asked to do a slab and footing design for a building addition that will house a 4300 gallon equalization tank. the addition is 14'x20' and the tank takes up part of the building with a footprint of 8'x12'. the architect proposed a 4" concrete pad atop the building's slab. my supervisor thinks it should be a floating pad separate from the building's slab. is this common procedure? i don't see a small slab like this helping anything if it isn't composite with the floor slab.
also, what is typically done when a tank is on part of a building's slab as far as bending? i'm more of a bridge guy so slab on grade design isn't my forte. i've found the tf 705-r-03 slab on grade design by wri. it mostly covers design on clay soil, whereas mine is strictly on sandy soil. i have the crack control down but worried about the large load from the tank. looking for a little guidance
i would probably put in on an separate foundation, isolated from the slab with expansion joint material all around. then analyze the foundation for bending.
i'm with your supervisor in seperating the slab under the tank from the building slab, as the part under the tank will likely try and settle some.
once you seperate the two, then you can design the portion under the tank as a regular concrete footing, and the slab as regular floor slab.
not knowing the situation exactly, you might consider seperating the tank footing from the slab with 3/8" or 1/2" expansion joint material caulked at the top.
for the tank footing i would place the top 4" above the top of the adjacent slab to make a 'house keeping' pad look. it also will somewhat disguise a bit of settlement by the tank footing in the future.
is your building heated? if frost heave might be a problem in an unheated building, then i would sink my footing down to frost depth. if the building is heated (or are you in a place where frost heave is not a problem), then i might think about say a 16" thick footing. 4" above the floor slab elevation, 12" below.
just my thoughts, not being fully aware of the exact situation.
thanks for all of your help. this tank is shoved in the corner of the building. i planned on having a perimeter footing below the prefabricated building walls, typical of all slab on grade designs. if i were to have a floating slab with footings, there would be two footings side by side on two sides of the tank. the building is not heated and the purpose of the building is to remove groundwater contamination and this tank is basically a holding tank for the air strippers.
so based on your guys recommendation, the tank's slab should be separated from the building's slab and the tank's slab will have footings on the perimeter as well. the slab will be elevated the 4" so any settlement will be not as noticeable. my calculated pressure on the slab from the tank is 400psf when full. again, thanks for helping this young engineer
a lightly loaded slab like the portion under the tank will require minimum thickness if the soil is capable of supporting the 400 psf from the tank and the weight of the slab. either tank footing connected to adjacent slab or separated by expansion material will work. if connected, use reinforcement at 6 inch spacing both ways .
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
slab on grade problem huangyhg 产品功能分析 0 2009-09-15 11:24 PM
slab on grade for tank foundation huangyhg 产品功能分析 0 2009-09-15 11:24 PM
reinforced tank design- the slab huangyhg 产品功能分析 0 2009-09-15 05:21 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
grade beam detail question huangyhg 产品功能分析 0 2009-09-09 02:57 PM


所有的时间均为北京时间。 现在的时间是 10:54 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多