默认 control joint spacing

control joint spacing
can anyone tell me where to find a recommended spacing for control or contraction joints in concrete walls? the walls will be below grade and have been designed for the lateral earth pressures to span vertically. i was looking in aci 301 but have not found anything. the copy i have is old so i may need to get a current one. if that is the right source can anyone tell me whic section i should be looking in.

i won't be able to cite aci too well but have recently been exposed to a wall cracking problem. i believe aci 224 has some general guidelines. one "general rule" is for vertical control joint spacing not to exceed 2 to 3 times the wall height.
now you could go to aci 350 for some stringent criteria, although this guide is for "environmental structures". it will lead you to greater reinforcing for crack control. as i recall the joint spacing is not to exceed 20 feet for "partial" joints (half the reinforcement discontinued), and 30 feet for "full" joints (all reinforcement discontinued). see that code for specific crack control reinforcement, joint spacing and joint detailing.
expansion joints - vertical expansion joints or movement control jointsto account for expansion due mainly to temperature changes and moisture conditions. on changing from a saturated to a dry condition, average concrete will contract approximately 2/3 of an inch per 100 linear feet. place vertical expansion joints 1/2 inch in width at max intervals of 90 feet throughout the length of retaining walls and fill with expansion joint material. all exposed edges shall be beveled 3/4 inch. the footings should incorporate an expansion joint too.
construction joints - these can be vertical or horizontal joints between successive pours of concrete. when it is not practical to pour the wall to full height in one operation, ensure construction joints are truly horizontal and provide a bond between the sections with keys formed by beveled timbers. where necessary to provide construction joints in the length of the wall, ensure joints are truly vertical and provide a bond between the sections with shear and sliding resistance keys formed by beveled timbers. spacing depends of project and crew.
contraction joints - vertical joints cut (or formed)into the wall. allows the concrete to shrink without showing the cracks. place 24-inch long, 1/2-inch diameter, commercial grade steel dowels and 12-inch long, 5/8-inch inside diameter, commercial grade steel dowel sleeves across the joint. provide caps on one end of the sleeves. grease one end of the dowel and insert into the sleeve. space dowels and sleeves at 12-inch intervals along the centerline of the wall stem. do not pass reinforcing steel through either joint. seal joints from top to bottom with waterstops. provide contraction joints at 30-foot intervals
one area that can be commonly overlooked, or at least underestimated, is the necessity to drain the backfill of rainwater and/or groundwater. hydrostatic pressure can cause or induce retaining wall failure, or at least damage
provide 4-inch weephole drains at 8-foot intervals through standard gravity. weepholes should have material between the wall and the backfill to prevent fines migration, and weephole clogging. if required drainage lines are required, consider perforated pipe and wrapped in geotextile or buried in a granular filter bed, and serve to carry water to the weepholes from areas deeper within the backfill.
i suggest a control joint every 16' or less in a straight walls without pilasters or obennings.
i would add a control joint at both exterior ends of a pilaster. where you have any opennings i.e. loading dock pit openning i would add a control joint.
i have tried all the above and we did minimize shrinkage crack appearance in foundation walls.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
control joint in structural slab on voidform huangyhg 产品功能分析 0 2009-09-08 01:44 PM
control joint in cmu wall huangyhg 产品功能分析 0 2009-09-08 01:44 PM
concrete slab-on-grade control joint reinforcemen huangyhg 产品功能分析 0 2009-09-08 12:45 PM
cmu control joint spacing huangyhg 产品功能分析 0 2009-09-08 09:30 AM
building joint spacing huangyhg 产品功能分析 0 2009-09-07 05:39 PM


所有的时间均为北京时间。 现在的时间是 02:36 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多