默认 cmu control joint spacing

cmu control joint spacing
i am designing a commercial building in northern nevada, 90' x 180' x 24' tall, with 8" lightweight cmu. what should spacing/size of expansion joints/control joints be? is there an industry reference? what is a common delta-t for temp. differential - 100 degrees f.? does that control the spacing, or does material drying/shrinkage control?
don't try to over-engineer a control joint. - there many good standards based on years of of history.
go to the national concrete masonry association (ncma) site at ncma.org. in the upper right section there is a square to click on to get access to the ncma tek notes. it is a series of over 100 documents written by engineers on various aspects of design and construction.
after you click to get to the tek note site, select a state(any state) and a producer/sponsor (any one) to get access to the tek notes that are indexed by subject and by key words.
you should find all the information you need with documentation to codes and standards. the staff engineers are
i always try to provide control joints every 8 metres (26') for reinforced corefilled masonry. provide control joints wherever you have change in heights of the masonry and near all returns. also to one side of a lintel beam.
if there is a control joint at one end of the lintel beam can you use arching action when designing the lintel? where will the required thrust come from?
enginerding:
there are a number of places that i do not use arching action for lintel design:
1) insufficient height over the lintel to develop arching
2) inadequate masonry on one or both sides of opening
3) stack bond
4) cj or exp. jt adjacent or near edge of opening
additionally, i design all steel or precast lintels to carry a minimum of 8 courses of green masonry before arching can happen. this is not necessary for block lintels in that they are normally shored.

thanks jike.
i completely agree - that was my point about the thrust. the only issue is that it seems as long as the top three issues don't apply, it is common to design with arching. if it is typical to use control joints at openings, then arching should rarely, if ever, be used in designing lintels.
enginerding -
you are correct about the first three items and that is why the roman aqueducts have performed and stood so well. they were pure masonry and not composite construction. the only joints were because of construction limits/processes or elevation changes.
if you have a veneer with dissimilar materials (brick with either concrete block, wood or steel), the control joints are required and the lintel must support the veneer dead load.
dick
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cmu bond beams huangyhg 产品功能分析 0 2009-09-08 09:30 AM
building joint spacing huangyhg 产品功能分析 0 2009-09-07 05:39 PM
building expansion joint or no huangyhg 产品功能分析 0 2009-09-07 05:37 PM
8 cmu placed w incorrect horizontal joint reinforcing huangyhg 产品功能分析 0 2009-09-07 08:57 AM
【转帖】how to create activex control in vb.net for use in tab via addcontrol3 yang686526 SolidWorks二次开发 0 2009-04-12 09:14 PM


所有的时间均为北京时间。 现在的时间是 04:44 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多