默认 drilled pier boundry conditions

drilled pier boundry conditions
one of my current projects is a 16' x 44' mat slab on drilled piers supporting 3 12'dia. x 32' x 162k (full) fermentation tanks (beer!). i had a geotech bore and provide me with recommendations (600psf skin for piers, k=50pci for mat). in one of my geotechnical books i found a method for computing short and long term settlement for the 18" drilled piers. would you model these piers as springs or fixed? i would think some sort of spring would be correct but one of my co-workers dissagrees. my fea model for the slab is greatly affected by what i set as boundary conditions. thanks. this forum offers a wealth of knowledge and i will contribute to the best of my ability.
i would model the piers as pin supports. i am not sure why the geotechnical engineer gave you a subgrade modulus for the mat--it doesn't make sense, since the mat is supported on piles and will not settle.
daveatkins
the piers are only along the 44' edges to help with om. would you ignore the soil underneath the slab and assume a clear span (14')? thanks.
you could model the piers as pins, and provide springs under the rest of the mat. depending on how thick your mat is, the piers will probably still take most of the load.
daveatkins
you can also use the tried and true floor-ceiling method.
first analyze as fixed, then with springs - you know the answer is somewhere in between so if you design all components of your mat to meet both you are covered. a bit conservative, i admit, but "when in doubt, make it stout".

thanks dave and jae. i checked it both ways and designed for the envelope. big, tall and heavy tanks in earthquake country. don't want to take any chances.
locating the piles under the cg of the tanks would be more cost efficient.
this is my pier / mat arrangement.
nice pun, jae.
don't spill the beer; agree with jae, make the lager stout.
stout is good, especially when you drink it.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cutting trough wall on drilled piers huangyhg 产品功能分析 0 2009-09-08 04:22 PM
cast in place pier constructiondesign huangyhg 产品功能分析 0 2009-09-07 11:01 PM
big concrete pier huangyhg 产品功能分析 0 2009-09-07 03:45 PM
anchorage into concrete pier pier sizing huangyhg 产品功能分析 0 2009-09-07 12:01 PM
anchor bolt uplift development lentgh in piers huangyhg 产品功能分析 0 2009-09-07 11:49 AM


所有的时间均为北京时间。 现在的时间是 07:47 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多