默认 cast in place pier constructiondesign

cast in place pier construction/design
the aci code provides for 3 inches of concrete cover when permanently exposed to earth for the construction of a drilled shaft pier. i would think it would be easier to have the rebar cage rest at the bottom of the pier for the purposes of construction. i am unaware of how the rebar cage supported otherwise during construction. i had been told once that the the purpose of the code was to prohibit corrosion of the steel, which requires moisture and air, and at the bottom of the pier there would be a minimum amount of corrosive action. i have seen piers designed in both ways(having the longitudnal steel extend to the end of the pier and detailed 3 inches short of the pier base) and i am looking for some clarification as to the preferred or proper design.
the concrete may be honeycombed at the bottom of pier. i have always spec'd 6" clear. the are plastic "chairs" which are attached to the bottom of the rebar cage that give the 3" or 6" clear.
is it really necessary to take the steel all the way to the bottom of the pier. we had a discussion of this in the past - depends on the design. but in many drilled shafts i have been involved with the steel was only in the upper part of the pile. sacrebleu is correct that there are chairs or other means of supporting your cage as you start the pour. i think that his suggestion of 150mm is good.
most piers, that i have seen just have rebar cages in the upper 10 to 12 feet. any bending moment will usually be pretty small by that depth. the only time that i have run a cage completely to the bottom is for a pier in tension.
a crane usually is holding the cage in place until enough concrete is poured and the cage is in place securely. i recommend a minimum of 4" clearance laterally. i have seen guys trying to hold the the cage in position laterally with 2 x 4's wedged between the cage and the casing. sometimes the cage will shift as the casing is pulled.
pmour,
in addition to the plastic chair supports, it is also a common practice to hang the cage from the slots at the top of the temporary casing at the ground surface until the concrete has been poured. no need to monopolize the service crane for holding the cage in this case.
jeff
jeffrey t. donville, pe
ttl associates, inc.
thanks for all the info. most of the foundations we use are not much deeper than 16 ft. in talking with the crews contructing the piers, they give the cage a lift into place during the pour, giving the concrete cover at the bottom of the pier.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cantilered column embedment into masonry pier huangyhg 产品功能分析 0 2009-09-07 10:34 PM
big concrete pier huangyhg 产品功能分析 0 2009-09-07 03:45 PM
anchorage into concrete pier pier sizing huangyhg 产品功能分析 0 2009-09-07 12:01 PM
1930s cast-in-place concrete reinforcing huangyhg 产品功能分析 0 2009-09-06 10:39 PM
【转帖】error c2664 yang686526 DirectDWG 0 2009-05-05 09:34 AM


所有的时间均为北京时间。 现在的时间是 12:56 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多