默认 rc slab strengthening

rc slab strengthening
please advice on the best way to detail the connection of a steel beam to an existing rc slab. the slab is about 400mm thick and the steel beam is used to strengthen the slab and reduce loads to other steel beams within the frame. my main worry is how to ensure that the new beam picks up the slab load and suitable connection details.
find a job or post a job opening
if you only need to ensure some bigger limit states load, drilled connectors tying such thick slab to the beam can be enough,
if, as it seems, you want the newly installed structure to partake in some predictable amount the current load, and of course its share of anything later loading on the whole structure, use jack ring cushions to transfer the wanted loads to your beam, then lock the loads by concreting.
in this process, inflatable jacks having the shape of blood cells would be put at a number of positions, say, 3 of them at quarters of the span, or at fifths etc, and are inflated, the pressures giving exact readings of the loads at the moment being transferred to your new structure, that acts as support of your jacks. when the readings indicate the loads that you want, by similarity of the diagram of moments scheme to what wanted, you can lock the loads concreting the space between the top flange of your beam and the slab with small shrinkage mortar, then after the mortar gaining strength, deinflate the jacks and complete the infill of mortar at the jacks position. by then you have locked standing loads in a known amount.
ishvaag,
can you be a bit clearer. i need more suggestions.
i would install the beam to within an inch of the underside of the slab. drive steel wedges at 1/4 points tight to the slab and then tack weld them to beam so they will not work loose. continuously dry pack with non-shrink grout between slab and beam.
if you anticipate that the slab could possibly lift off the beam (due to loading or some other affect) then i would recommend that some fasteners be installed from the beam into the slab.
ishvaags suggestion is similar to something we did recently
two steel dowels were installed between the beam and slab near the centre of the beam, the ends of the beam were then jacked up to predeflect the beam, then the columns under the ends installed after. then the remaining gaps were grout packed.
the slab was holding brick walls above and the steel beam was installed to allow removal of a brick wall under. predeflection was important to stop the brick walls over cracking.
for a heavy slab like the one in the op, ishvaaag's way is best, as it allows the best control of the preload placed on the beam. the jacks he described are normally called "flat jacks".
for small beams, they can simply be wedged, with the deflections measured and correlated to the preload.
the method chosen, shim tight or preloaded, should reflect your analysis. in other words, if the existing beams carry all the dead load and share the live load only witht the new beams, then i would use the "shim tight" method. however, if your intention is to have all beams (existing and new) share dead and live load then use the "preloaded" method.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
post-tensioned beams parallel to slab huangyhg 产品功能分析 0 2009-09-15 01:51 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
existing rc slab evaluation huangyhg 产品功能分析 0 2009-09-09 08:58 AM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM
coring through rc slab huangyhg 产品功能分析 0 2009-09-08 02:02 PM


所有的时间均为北京时间。 现在的时间是 06:24 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多