几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 11:44 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 sloped bond beam

sloped bond beam
we called out a continuous reinforced masonry bond beam near a roof. the roof elevation slopes. the bond beam is acting as a chord. is it common for the bond beam to slope with the roof? is this easy for contractors? how is this done since blocking is in 8" increments? would it just be better to place the top of the bond beam near the low point of the roof and just keep it at one elevation? there is an approximate change in roof elevation along the wall of 2'-0". thanks.
find a job or post a job opening
the masonry will be "racked back", meaning it will be stair stepped roughly following the roof slope. you will then have a cast-in-place bond beam that slopes with the roof. i would leave the lintel screen down one course of block so that the top course of block will get poured along with the raked concrete beam and tie them together along with whatever reinforcing you come up with. the location of the stair steps for the masonry will be determined by how deep you designate that concrete sloped beam, a.k.a. a "raked" bond beam or tie beam, and the slope of the roof that the top of the concrete tie beam has to follow.
what's a lintel screen? so the bond beam will be 8" deep at the low point and 24" deep at the high point. the bottom of the bond beam will remain at the same elevation, while the top of the bond beam will step to follow the roof slope. will the rebar (2#7 in a 12" thick wall) slope also? will shells of block need to be busted out to let the rebar slope? thanks.
broncosfan:
i use stepped bond beams. the bond beam starts at the lowest point in the wall, and runs until there is a full course of masonry above it, then steps up to the next course. i generally show to overlap the lengths of the two beams 2 to 4 feet (depending on bar sizes used in the bond beams) so the bond beam is 'spliced'.
lintel screen is what is used in my area to prevent the entire cmu wall from pouring instead of only the bond beam. it is a roll of screen slightly less wide than the wall that goes under the first course to pour.
the bond beam is as deep as you want it. the top of the concrete slopes with the roof. the bottom will step with the cmu. the rebar may be laid on top of the masonry or put up on chairs and usually slopes with the roof to be parallel with the top of the bond beam.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
question regarding floor support beam installation huangyhg 产品功能分析 0 2009-09-15 03:58 PM
bond beam huangyhg 产品功能分析 0 2009-09-07 04:20 PM
bond beam location huangyhg 产品功能分析 0 2009-09-07 04:19 PM
beam strengthening huangyhg 产品功能分析 0 2009-09-07 03:04 PM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM


所有的时间均为北京时间。 现在的时间是 10:23 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多