默认 load comb and 1.0 factor of safety

0.6d+w load comb and 1.0 factor of safety
before i type, i'll go ahead and reference a previous thread that has been closed.
i have never used this combination to check stability, because i couldn't think of a logical case out of it. maybe others have better point of view, would like to hear it.
the ibc 2006 does not state directly "the 0.6d+h load combo is consider to meet the factor of safety required in section 1806.1" (though is should) - that is what the entire previous discussion and my response in the thread you referenced was meant to clarify.

i have some additional questions.
question 2
let's assume your designing a one-story building with a design roof dead load of 30psf (let's call this dmax) for example, but your actual self-weight is probably somewhere around 15 psf (let's call this dmin). let's assume an applied wind of 20psf uplift.
if you're using something like a dmin, does the 0.9 to account for an over estimating on dead load need to be applied? that would make the 0.6 factor become 1/1.5 = 0.667dmin + w.
which is correct?
(0.6 x 30 psf) – 20 psf = -2 psf
(0.6 x 15 psf) – 20 psf = -11 psf
(0.67 x 15 psf) – 20 psf = -10 psf
question 3
these load combo rules make more sense to me with a "normal" building where the dead load is equal to or greater than the wind load. but do they hold up with a very light structure like a pre-engineered building where the dead load can be fractions of the wind load.
take for example, a pemb where the column dead load is 2 kips down and the column wind load is 11 kips up.
0.9d + w = (0.9 x 2) – 11 = -9.2 kips → 9.2 x 1.5fs = 13.8 kips resistance required → 92 cf concrete → 7' x 7' x 2' footing
0.6d + w = (0.6 x 2) – 11 = -9.8 kips → 9.8 x 1.0fs = 9.8 kips resistance required → 66 cf concrete → 6' x 6' x 2' footing
both of these answers are technically correct, but you can tell that they are obviously much different. i would feel much better using 0.9d with 1.5 fs for pemb's than the 0.6d with 1.0 fs.

in response to your question #3.... i think the real comparsion should be this:
0.9 (dl + sw) > 1.5 * w
therefore, the required additional dead load is:
sw reqd > (11*1.5 - 0.9*2) / (0.9) = 16.3 kips
similarly, the 1.0 requriement would be:
0.6 (dl+sw) > 1.0 *w
sw required > (1.0*11-0.2*0.6) / 0.6 = 18.1 kips

correction to my last equation:
sw reqd > (11-2*0.6) / 0.6 = 16.3
therefore, it ends up being exactly the same as the old requirements.
let me ask you this.
for pemb's, the worst case downward is usually
dead + collateral + (roof live or snow)
should collateral load be figured into the 0.6d+w combo?
is it (0.6 x self weight dead) + wind
or (0.6 x self & collateral) + wind
i would not use 60% of the cl as part of the dl. it is possible the cl will never be there. i use 0.6*d, with d being only the loads i know will be there.
just went back and forth (repeatedly) with a pemb supplier about this, i couldnt get them to run the min column loads with 0.6*d + w. they were including the cl in the dl case which in my case exceeded the normal dl. and the cl will most likely never be there.
the metal building manufacturer's association recommends you not use the collateral load when checking for wind uplift, as in 0.6d+w.
thanks guys.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭



所有的时间均为北京时间。 现在的时间是 12:42 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多