默认 150 50 ton overhead crane structure

150 / 50 ton overhead crane structure
1st - a 150 / 50 ton overhead crane structure is dynamically loaded while in motion correct? if so, shouldn't the structure always be classified as dynamic, from the begining of design, fabrication, and erection?
2nd - as a follow up inspector for the sub-contractor i've found discrepancies from the sub's draftsman/detailer (ie... hole spacing for various structual connections, all over the structure. strut beam to column connections hole spacing(4 1/4" gage at column flange, 4 3/8" gage at strut beam connection clips/lugs: wrong size angle for bracing as per contract drawings, angle toed up instead of down: top cord angle bracing gusset/connection plates erected underneath the top flange of the trusses, as well as bad weldsand lack of welds : bottom cord bracing and strut beams erected with the wrong size a325 bolts.
3rd - to make the structual members fit, the erectors thermally oversized the holes with an oxy-fuel torch, very poor workmanship!
4th - several columns extremely out of plumb, span out of tolerance according to cmaa, as well as straightness of girders.
5th - i'm at a loss, the whole structure has been erected with these problems, can it be repaired or should it be condemned?
what authority do you have as a "follow up inspector"? the installation should be rejected as noncompliant and let the chips fall where they may. the situation is serious and cannot be allowed to stand unchallenged. a 150 ton overhead crane is not a toy. failure could have disastrous consequences.
your post states that you are a follow up inspector for a sub-contractor. is there an inspector representing the owner? this sounds very serious and also sounds like a pre-engineered building without a tight spec and contract or a structural engineer of record. the details of a building with a crane cannot be taken lightly. notify the structural engineer of record (if there is one) and the owner of your findings. 150 ton cranes are not cheap and neither are the spare parts. the fourth item in your post will wear out wheels, bearings and rails very quickly and frequently.
this can be repaired but it will take some work.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
1 ton hoist calculation huangyhg 产品功能分析 0 2009-09-06 10:25 PM


所有的时间均为北京时间。 现在的时间是 01:03 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多