几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 08:29 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 2006 ibc special inspections 9ch 170

2006 ibc special inspections (ch 17)
i typically do residential work so i'm not too familiar with the permit rules for commercial projects.
i'm getting ready to be the eor on a public bathroom. the building will be on wood piles in a high wind zone. (a very basic rectangular building).
1704.1.2 requires special inspections for the following (list of 7 possibilites)....included in this list is pile foundations (this building applies). understood, i'll have to get the piles inspected. there's a table (1704.8)that makes this very simple. it details what to check & how often. this building does not meet any of the other requirements. so i would think i've completed the inspection section. doesn't seem to be the case, though.
when you get to section 1705 it talks about the "statement of special inspections." this includes a section about wind which would include this building. 1705.4.2 details what the statement should include. it's actually pretty simple. there isn't anywhere that i've seen, though, that discusses actual inspections or frequencies. do i just have inspections for the piles and include my high wind statement as a formality?
i feel like i'm going in circles - any advice, more resources other than just the code? thanks.

check out our whitepaper library.
eventually what city inspector / engineer wants will control. give them a call
ditto - and you may be able to do the inspections yourself!
create your own "special inspection plan" for the building and file it with the plans. that way it will become a part of the plan approval process and will need to be done...and as mike said, you could do it yourself, but in any case you are establishing the criteria and as eor that's where you need to be.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
2006 ibc seismic design huangyhg 产品功能分析 0 2009-09-07 08:28 AM
2006 ibc conc. load factors huangyhg 产品功能分析 0 2009-09-07 08:28 AM
2003 ibc 1620.1.6 huangyhg 产品功能分析 0 2009-09-07 08:26 AM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM
【转帖】绝对能够测试你的c语言功力的几个问题! yogy vc编程 0 2007-06-20 04:24 PM


所有的时间均为北京时间。 现在的时间是 12:29 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多