几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 09:46 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 aci 318-05 - dragstrut connection to concrete

aci 318-05 - dragstrut connection to concrete
i am needing to transfer 11kips laterally out of a roof diaphragm into an 8" x 24" concrete counterfort as another engineer called it. it is a well-reinforced member with the highest stirrup within 2" of top of concrete. as i look at sizing anchor bolts at the top to transfer my 11k lateral load into the wall, i'm getting really confused by section d.6.2.2. is "h sub a" in figure 6.2.1(b) that height above the highest stirrup where concrete is constrained? the definition says it's the thickness of the member in which an anchor is located. well.....i don't think they're wanting me to input 10 feet!! can somebody help me out here? thanks.
take the distance from the near anchor to the face as c sub a one. if the height of your counterfort is greater than the distance 1.5x(c sub a one), then use figure rd.6.2.1(a) which has breakout dimension of 1.5x(c sub a one) in the vertical. the stirrups add to the concrete breakout strength by the area of steel crossing the pyramid plane times the yield strength.
thanks civilperson,
would it be too conservative, since my stirrup is capable of resisting all of that 11k load (despite being held down 2" or so from the top of the concrete) that my anchor bolt could be sized as a bending
connect the three anchor bolts by using a plate with holes to apply the lateral load. share the load to the three bolts, each receiving one-third, and analyze just as you described as a 2" cantilever beam. use the stirrup strength to resist the horizontal shear if it is sufficient, (quicker than calculating concrete side blowout strength). anchor bolts need stirrups in the top 5" of the concrete, two no. 4 or three no. 3.
that is what i was planning on doing with the plate. one last question........."anchor bolts needing stirrups in the top 5" of concrete...." what am i missing? i'm not finding that provision in the aci. can you help me out please?
thanks so much for your professional advice!!

aci 318-08, 7.10.5.6
thanks so much. i must have glanced right over that!!!
civilperson,
i know why i glanced over it.......my concrete is not a compression member as it really is only transferring shear forces. i think i read the note under 7.10.5 ties referring to compression members and skipped over the rest. i don't do a whole lot of concrete design. having those ties up top can't hurt.
thanks again.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
aci 318 appendix d huangyhg 产品功能分析 0 2009-09-07 09:42 AM
28 day vs. 56 day concrete breaks huangyhg 产品功能分析 0 2009-09-07 08:34 AM
1.3 connection factor for concrete huangyhg 产品功能分析 0 2009-09-06 10:25 PM
【转帖】哪位高手指点一下下边lisp的怎么用 yang686526 数据库ObjectDBX 0 2009-04-28 12:13 PM
哪位高手指点一下下边lisp的怎么用 yang686526 ObjectARX(AutoLISP) 0 2009-04-26 06:19 PM


所有的时间均为北京时间。 现在的时间是 10:20 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多