another composite question
does anyone know why (in the green book) that in order to get the number of studs for 100% composite action you find the smaller of 0.85f'cac/2 and fyas/2?? why are they both divided by 2? this makes a pretty big difference in the % of composite action you get for a given number of studs (you get a much higher % composite for a given number of studs compared to the 13th ed spec) or the the number of studs needed for a given % of composite action (you can use fewer studs to gain a specific % of composite action compared to the 13th ed spec). this obviously makes a difference in deflection calcs as well.
i don't have the green book with me but i think that is the old safety factor.
taking the lesser of the steel capacity and 0.85% of the concrete capacity ensures ductile failure.
85% i mean
haynewp-
i thought that might be it, but that approach makes it so you need fewer studs to get 100% composite action (which is unconservative). if the stud values were factored down by 2 as well, then it would make more sense, but the stud values are only factored down by 1.5.
lobstaeata-
ductile/nonductile failure doesn't have anything to do with what i'm asking. i'm asking why the values are divided by 2. btw, the 0.85 isn't to ensure a ductile failure it's the value always applied to concrete in compression (no different than a concrete beam).
eit
i thought the following was your first question
does anyone know why (in the green book) that in order to get the number of studs for 100% composite action you find the smaller of 0.85f'cac/2 and fyas/2??
it seemed to me that the fact that this addresses ductile failure is what your question was asking. sorry if i understood your question incorrectly.
oh and btw in any concrete (or composite design), it is critically important to check for ductile failure of the
that's the factor to get the values down to estimated working load level.
lobsta-
i was specifically asking why they are divided by 2, not why those two specific criteria are considered. i understand why those two criteria are considered, i just don't understand why they are both being divided by 2. haynewp has stated an opinion, but i address that below. also, these two criteria have nothing to do with ductility as there are no ductility requirements (that i'm aware of) for a composite steel beam. additionally, while it is good practice to check for ductility in a concrete beam design it isn't required. that's all taken into account with the sliding phi factor.
haynewp-
i originally thought that it was to get everything down to working loads, but then why are the nominal stud strengths reduced by 1.5 and not 2? it seems to me that this would underestimate the strength at an actual failure condition, no?
my old steel book says the studs strengths are reduced by a factor of 2.5 to get working load values.
that would make sense then, but the green book uses asfu/1.5.
what page?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
adding studs to existing composite beam huangyhg 产品功能分析 0 2009-09-07 10:13 AM
question about composite position huangyhg tec-ease(America) 0 2009-09-05 12:30 PM
how to measure composite positional tolerance huangyhg tec-ease(America) 0 2009-09-05 11:17 AM
【转帖】question about composite position yang686526 American standards 0 2009-04-29 09:36 PM
【转帖】composite two-single feature frame position tolerance yang686526 American standards 0 2009-04-29 07:00 PM


所有的时间均为北京时间。 现在的时间是 02:55 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多