几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 05:07 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 bridge crane seismic loads on buildings

bridge crane seismic loads on buildings
i am analyzing existing industrial buildings for seismic upgrades in zone 3. these buildings have cranes. my question is what % deadload should be used for analysis and what is the reference. i checked asce 7, asie technical report 13 for construction of mill buildings, aisc design guide 7 part 2 for design of industrial buildings with cranes, aisc seismic provisions and 97 ubc. all these address cranes but don't seem to provide the information i need for a "simplified seismic analysis".
pre 1990 documents i have looked at use a constant accelleration factor of 0.45g in major horizontal planes and treat the cranes like machinery attached to the building with a higher acceleration due to the possibility of a different frequency than the building. i don't find this method after the seismic codes changed in 1994.
does anyone have some united states code references on the current method of analyzing buildings with cranes?
check out our whitepaper library.
in the ibc 2000, section 1617.4.1, the definition of w (for the mass of the building) includes in the amount for w the following:
"3. total operating weight of permanent equipment."
this would be the weight of the crane, rails, and hoist dead loads. no mention of crane live loads is included as i would imagine the natural period of the hung weight would be so large as to negate any resonance with the building period.
i would only use the permanent weight and not the hoisted load for the seismic analysis.
the hoisted load is not fixed to the structure and will not contribute to the exciting force
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
bridge crane manufacturers who will repond huangyhg 产品功能分析 0 2009-09-07 05:06 PM
bridge crane loads huangyhg 产品功能分析 0 2009-09-07 05:06 PM
bridge crane design huangyhg 产品功能分析 0 2009-09-07 05:06 PM
bridge crane building frame drift limitations huangyhg 产品功能分析 0 2009-09-07 05:05 PM
bridge abutment design huangyhg 产品功能分析 0 2009-09-07 05:02 PM


所有的时间均为北京时间。 现在的时间是 06:54 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多