几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 10:37 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 cantilever lengths max - need back-up

cantilever lengths max - need back-up
ok, we got rid of the thirteen foot conical cantilever over the garage with the slate roof that took the two steel beams weighing 3800 pounds apiece (i may be exaggerating slightly, but not much) due to expense. i have managed to find criteria for trusses stating that the maximum cantilever using a strut is .25l, l being the span. and i know about the rule of thumb of twice the back span...but i cannot seem to get through to this guy... is there anything else anyone knows of that gives a more solid...reason than common sense not to use a cantilever with say, oh .44l? i mean, i can make it work, i suppose, uplift at the opposite end, bracing of the compression chord, check the stresses check the deflections and make it stout, but it is so stupid. any help anyone can give me would be appreciated.
find a job or post a job opening
sorry guys, did not mean to be unclear, the cantilever i referred to above as ".44l" is incorrectly noted - it is actually .71l, with l being the backspan length.
i always work on a rule of thumb of 1/3l max cantilever to 2/3 min backspan.

without seeing the actual detail it is difficult to judge but if you have reservations over your design, go with your gut feeling. if it looks right it usually is right but if it looks wrong that's because it is wrong!
scherry:
i assume by "this guy" you mean your client? if you feel uncomfortable using a cantilever that isn't 1/3 - 2/3 just tell him it's "not economically feasible". clients understand $$$, not stresses, moments, & uplift reactions.
actually, "this guy" is "arch the bobitect". unfortunately, he is a friend of the client, and he is designing his dream structure without much regard, in my opinion, for the comfort or wallet of his friend. one "design" he offered me as a solution for the late unlamented 13 foot cantilever was a 6" steel beam with a back span of nine feet to the 13 foot cantilever... according to his calculations it only deflected a half an inch at the tip...except that he forgot to convert from feet to inches and didn't quite understand the deflection formulas. he suggested that he needed a refresher course over a beer sometime...i am far away though, and he could not see my face when he said that. i will try the cost issue...since it is true. thanks guys. i appreciate the help. and the chance to pound the keys if not my fists...
i'm guessing he assumed total fixity when he "computed" the deflection. model in the actual beam with its corresponding rotation at the support and the deflection may go up considerably.
while i agree that clients don't understand shears and moments, they sure can see deflection. most lay people are surprised when they find out the deflections we deal with and allow in a structure. show him the 1 1/2" deflection and see what his reaction is.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
calc. reactions for propped cantilever huangyhg 产品功能分析 0 2009-09-07 06:10 PM
back to back channels huangyhg 产品功能分析 0 2009-09-07 02:08 PM
请帮忙解决以下这个程序不能运行的问题,谢谢 yang686526 数据库ObjectDBX 0 2009-04-28 04:28 PM
请帮忙解决以下这个程序不能运行的问题,谢谢 yang686526 ObjectARX(AutoLISP) 0 2009-04-27 12:34 PM


所有的时间均为北京时间。 现在的时间是 02:37 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多