默认 concrete column join

concrete column joint
i'm searching to find out what, if any, codes apply to placing a joint in a concrete column.
the situation is that the top of a column had failed due to incorrect installation. a bearing plate was shimmed when it should have been grouted.
anyway, one of the considerations is to level it off a few feet down and pour a new top to it.
the question is "what codes apply?"
find a job or post a job opening
if you chip the top section of concrete away to allow placement of a new section of fresh concrete, be sure that your column longitudinal steel is properly developed past the "joint" that you are creating. i would also specify that the existing surface be left rough (1/4" amplitude).
check the shear that is going through the column at that point against shear friction. you might want to also add a bit more column ties - especially at the top if you have a bearing plate concentrated load. many times we will specify three or four spaces of ties at 3" (75mm) o.c.
i have not come across some codes indicating proposed location of column joints (i would like to know if there is..)
locating column joint is based on engineering judgement. as most columns are under compression, the decision to locate joint will be governed mostly by horizontal loads at that location as shear capacity have to checked (as mentioned by jae).
drewtheengineer,
a joint in a column is not worse than a construction joint in a beam. see aci 318, section 6.4. by the way in all buildings taller than one story, there are construction joints in the columns.
as jae said, the longitudinal reinforcing steel has to be developed past the joint, and the concrete surface has to be prepared to transfer the shear (roughened surface or shear key.)
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete beam to column connection huangyhg 产品功能分析 0 2009-09-08 11:43 AM
concrete beam connection to steel column huangyhg 产品功能分析 0 2009-09-08 11:40 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
cantilever steel beam at column huangyhg 产品功能分析 0 2009-09-07 10:40 PM
another aci slender column question huangyhg 产品功能分析 0 2009-09-07 12:13 PM


所有的时间均为北京时间。 现在的时间是 04:45 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多