默认 concrete cover w vapor barrier

concrete cover w/ vapor barrier
can the required 3" of concrete cover be reduced for a slab that is cast against the ground if a vapor barrier is used?
i'm not sure - it makes sense that its not technically "exposed to earth or weather" but in most slab applications i have the reinforcing in the upper portion of the slab so i've never really worried about it.
vb's are not always placed perfectly so i would probably still require the 3".
i would opt on the side of error...vapor barriers are easily omitted. keep the 3"...low cost, but could protect a large error
i would think that it is the variation in the soil profile that forces the need for a cover of 3" and not the exposure to the soil. observe the bottom of a footing or a slab when it is removed.
from as3600 (australian) for concrete in contact with the ground;
-add 10mm cover if cast onto a vapour barrier (compared to cast against formwork).
-add 20mm cover if cast directly onto the ground.
the 3" cover requirement does not apply to slabs cast on ground, unless it is transmitting loads to the ground. aci 360, not 318, would govern. if it is a structural slab, then yes, i think you could reduce it with a vapor barrier, but i agree that you take a chance hoping that the vb remains intact.
this will be a structural slab that is cast against the ground. this is a beachfront home so i am accounting for scour. all things considered, i think my best option will be to increase my slab debth in order to get the 3" cover. thanks for all the input.
the 3" cover requirement is meant to account for three things:
1. the potential exposure to moisture from the soil.
2. the reduction in cover due to variable subgrade elevation.
3. the mixing of soil and concrete at the interface.
placing the slab on a good quality vapor barrier such as 15 mil polyolefin over a well-compacted cushion layer will help address some of these concerns. a reduction in cover is reasonable, but is not directly addressed in the aci 318 code. i guess that is where "engineering judgment" comes in.
i like this 3" rule. our australian code as3600 typically prescribes far less than this. i feel our code does not adequately account for these items taro mentioned.
stick to 3", vb will just add protection for your slab againts moisture and undesirable chemical contamination of your subgrade.

i do not recall coming across this specifically during a plan review but i would have to say, reading the code literally, you can consider the vapor retarder as preventing the concrete from being in direct contact with the earth.
don phillips
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete cover for water tight concrete huangyhg 产品功能分析 0 2009-09-08 11:57 AM
concrete cover at reinforcing couplers huangyhg 产品功能分析 0 2009-09-08 11:56 AM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
analysis of concrete slab huangyhg 产品功能分析 0 2009-09-07 11:35 AM


所有的时间均为北京时间。 现在的时间是 08:26 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多